My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2015 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRESNO
>
1524
>
2300 - Underground Storage Tank Program
>
PR0506545
>
COMPLIANCE INFO_2015 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2023 10:44:17 AM
Creation date
9/24/2018 10:40:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2015 - 2018
RECORD_ID
PR0506545
PE
2361
FACILITY_ID
FA0007491
FACILITY_NAME
VALLEY PACIFIC FRESNO AVE CARDLOCK
STREET_NUMBER
1524
STREET_NAME
FRESNO
STREET_TYPE
AVE
City
STOCKTON
Zip
95206
APN
16337025
CURRENT_STATUS
01
SITE_LOCATION
1524 FRESNO AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
311
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVED <br />F. in -Tank Gauging / SIR Equipment: X Check this box if tank gauging is used only for inventory control. <br />Check this box if no tank gauging or SIR �py�ipfr�grt� isap;�talled. <br />This section must be completed if in -tank gauging equi vent is used to perform leak detection monitoring. IVtAfS 3 1 LU �� <br />-_t ENVIRONMENTAL. <br />Uompiete enn ivnvvrIT <br />Yes No <br />���Q���»�. <br />Has all input wiring been <br />spected for proper entry and termination, including testi gr n <br />Yes <br />No* <br />Were all tank gauging prc <br />es visually inspected for damage and residue buildup? <br />Yes <br />No* <br />Was accuracy of system <br />roduct level readings tested? <br />Yes <br />No* <br />Was accuracy of system <br />ater level readings tested? <br />Yes <br />No* <br />Were all probes reinstall <br />properly? <br />Yes <br />No' <br />Were all items on the eqL <br />ment manufacturer's maintenance checklist completed? <br />In the Section H, below, describe how and when ithese deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD): Check this box if LLDs are not installed. <br />Complete the foilowin checklist; <br />X Yes <br />No` <br />For equipment start-up o annual equipment certification, was a leak simulated to verify LLD performance? (Check all <br />N/A <br />that apply) Simulated le rate: X 3 g.p.h.; 0.1 g.p.h ; :.. 0.2 g.p.h. <br />X Yes <br />No* <br />Were all LLDs confirmed perationai and accurate within regulatory requirements? <br />X Yes <br />No* <br />Was the testing apparat properly calibrated? <br />X Yes <br />No' <br />For mechanical LLDs, d s the LLD restrict product flow if it detects a leak? <br />N/A <br />Yes <br />No' <br />For electronic LLDs, doe 1 the turbine automatically shut off if the LLD detects a leak? <br />X NIA <br />Yes <br />No* <br />For electronic LLDs, doA is the turbine automatically shut off if any portion of the monitoring system is disabled or <br />X N/A <br />disconnected? <br />Yes <br />No* <br />For electronic LLDs, do 5 the turbine automatically shut off if any portion of the monitoring system malfunctions or <br />X NIA <br />fails a test? <br />i Yes <br />No* <br />For electronic LLDs, haw all accessible wiring connections been visually inspected? <br />X N/A <br />X Yes <br />No* <br />Were all items on the eq ipment manufacturer's maintenance checklist completed? <br />In <br />H <br />
The URL can be used to link to this page
Your browser does not support the video tag.