My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012 - 2014
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRESNO
>
1524
>
2300 - Underground Storage Tank Program
>
PR0506545
>
COMPLIANCE INFO_2012 - 2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2019 11:18:53 AM
Creation date
9/24/2018 11:22:01 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO_2012 - 2014
FileName_PostFix
2012 - 2014
RECORD_ID
PR0506545
PE
2361
FACILITY_ID
FA0007491
FACILITY_NAME
VALLEY PACIFIC FRESNO AVE CARDLOCK
STREET_NUMBER
1524
STREET_NAME
FRESNO
STREET_TYPE
AVE
City
STOCKTON
Zip
95206
APN
16337025
CURRENT_STATUS
01
SITE_LOCATION
1524 FRESNO AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Secondary Containment Testing Report Form - Page 2 of 5 <br />D. Testing of Tank Annular SpacesNaults <br />❑ N/A (No tanks have secondary containment) <br />Test Method Developed By: E]Tank Manufacturer; ® Industry Standard; ❑`i'E; ❑Other (Specify): m <br />Test Method Used: Q Pressure; ® Vacuum; ❑ Hydrostatic; ❑ Other (Specify): <br />Test Equipment Used: gauge Equipment Resoluti«n: 0.5" HG <br />Tank #: DSL Tank#: Tank #: Tank #• <br />Is Tank Exempt From Testing? <br />; ® No <br />F-1Yes; [:1No <br />❑ Yes; [:]No <br />❑ Yes; ❑ No <br />�I Tank Capacity (-all ns o )20,000 <br />Enviroflex <br />Enviroflex <br />_ <br />Diesel <br />Product/Grade Stored in Tank: <br />DSL <br />Wait time between applying <br />pressure/vacuum/water and 30 Min. <br />starting test (minutes): <br />30 Min. <br />30 Min. <br />Tank Manufacturer: <br />Unknown <br />10:37 <br />1:40 <br />1:40 <br />Tank Model: <br />Unknown <br />5.1 PSI <br />5.0 PSI <br />Test End DatelTime: 10:45 <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test (minutes): <br />30 Min <br />2:40 <br />_ <br />5.2 PSI5.1 <br />_ <br />Test Start Time: <br />8:10 <br />Change in Reading (RF — R): 0.0 PSI <br />0.0 PSI <br />0.0 PSI <br />Initial Reading (RO: <br />10" HG <br />0.0 PSI <br />0.0 PSI <br />_ <br />Test End Time: <br />10:10 <br />® Pass; ❑ Fail <br />❑ Pass; ® Fait <br />Final Reading (RF): <br />10" HG <br />Change in Reading (RF — R,): <br />0.0" HG <br />Pass/Fail Threshold or Criteria. <br />0.0" HG <br />Test Result: <br />® Pass; ❑ Fail <br />❑ Pass; ❑ Fail <br />❑ Pass; ❑ Fail <br />❑ Pass; ❑ Fail <br />Was leak detection sensor <br />properly replaced and verified <br />as functional ager testing? <br />i ®Yes; ❑ No; <br />❑ NIA (Not Removed) <br />❑Yes; ❑ No; <br />❑ N/A (Not Removed) <br />F-1 Yes; ❑ No; <br />❑ N!A (Nut Removed) <br />❑Yes; ❑ No; I <br />❑ N/A (t*So[ Removed) <br />E. Testing of Secondary Piping or Containment Trenches ❑ N/A (No piping 2° containment) <br />Test Method Developed By: ❑ Pipe/Trench Manufacturer; ® Industry Standard; ❑ PE; ❑ Other (.Specib): <br />Test Method Used: ® Pressure; ❑ Vacuum; ❑ Hydrostatic; ❑ Other (Spec): <br />Test Equipment .men Used: gauge \ Pipe Run #: DSL Pipe Run #. DSL 1/3 Equipment Resolution: 0.2 PSI <br />g p gang <br />� p { Pipe Run #. Sat #3 � Pipe Run #: Sat #1 <br />lz Sec. to Dis r 2/4 Sec. to Dis <br />pipe''Trench Manufacturer: Environ <br />Environ <br />Environ <br />Environ <br />Pipe/Trench Model: Enviroflex <br />Enviroflex <br />Enviroflex <br />Enviroflex <br />Product/Grade in Line: Diesel <br />Diesel <br />Diesel <br />Diesel <br />Wait time between applying <br />pressure/vacuum/water and 30 Min. <br />starting test (minutes): <br />30 Min. <br />30 Min. <br />30 Min. <br />Test Start Date/Time: 9:45 <br />10:37 <br />1:40 <br />1:40 <br />Initial Reading (Rj): 5.1 PSI <br />5.2 PSI. <br />5.1 PSI <br />5.0 PSI <br />Test End DatelTime: 10:45 <br />11:37 <br />2:40 <br />2:40 <br />Final Reading (RF): 5.1 PSI <br />5.2 PSI5.1 <br />_ <br />PSI <br />0.0 PSI <br />Change in Reading (RF — R): 0.0 PSI <br />0.0 PSI <br />0.0 PSI <br />0.0 PSI <br />Pass/Fail Threshold or Criteria: 0.0 PSI <br />I <br />0.0 PSI <br />0.0 PSI <br />0.0 PSI <br />Test Result: ❑ Pass; ❑ Fail <br />® Pass; ❑ Fail <br />® Pass; ❑ Fail <br />❑ Pass; ® Fait <br />1 1-054-''5 02/26/02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.