Laserfiche WebLink
Secondary Containment 'Testing Report Form -Page 3 of 5 <br />F. Testing of Piping Sumps/Turbine Sumps <br />Fl N/A (No piping/turbine sumps) <br />Test Method Developed By: Z Sump Manufacturer; 0 Industry Standard; El PE; 0 Other (Specify): <br />Test Method I ised: El Pressure; El Vacuum; 0 Hydrostatic; El Other (Specify): <br />Test Equipment Used: Incon TS -STS l-qLlipMeritResolution: 0.001" <br />Sump DSL Sump Sump Sump <br />Sump Diameter (inches): <br />Sump Depth (inches): <br />42 <br />36" <br />Sump Material: <br />FRP <br />Height from Tank Top to Top of <br />Highest Pipe Penetration (inches): <br />1211 <br />Height from Tank Top to Lowest <br />Electrical Penetration (inches): <br />20" <br />Portion of Sump Tested: <br />Bottom Half <br />If turbine shuts down when sump <br />sensor detects liquid, specify <br />turbine shutdown response time. <br />Z A <br />minutes. <br />O N/A <br />minutes, <br />❑ N/A <br />minutes. <br />0 N/A <br />minutes. <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />15 minutes. <br />15 minutes. <br />Test Start Date/Time- <br />9-24 10:04 <br />Initial Reading (Rt): <br />2,452 2:466 <br />............. <br />Test End Dat /Time: <br />9.39 10:19 <br />Final Reading (RO: <br />2.454 2.465 <br />Change in Reading (Rf— Rj): <br />0.002 0.001 <br />Pass/Fail Threshold or Criteria: <br />0.002 <br />Test Result: <br />Z Pass; 0 Fail <br />El Pass; El Fail <br />Ej Pass; [3 Fail <br />0 Pass; El Fail <br />Was leak detectionsensorEg <br />properly replaced and verified as <br />functional after testing? <br />Yes; n No; <br />M N/A (Not Removed) <br />Q Yes; ❑El <br />El N/A (Not Removed) <br />❑No; El ❑Yes; El <br />❑ N/A (Not Removed) <br />❑No; El ❑Yes; [] No; <br />❑ N/A (Not Removed) <br />G. Testing of Under -Dispenser Containment (UDC) <br />7 N/A (No dispensers or no UDC) <br />'rest Method Developed By: 0 UDC Manufacturer; 0 Industry Standard; L PE; L Other (Specify): .............. <br />Test Method Used: 0 Pressure; [] Vacuum; E Hydrostatic; [] Other (Specify): <br />Test Equipment Used: Incon TS -STS ...... ..... I I Equipment Resolution: 0.001 <br />LIN -054 - 3/5 www. unidomorg 02/26/02 <br />