Laserfiche WebLink
SWRCB, January 2002 <br />5. SECONDARY PIPE TESTING <br />No of <br />'I'cst Method Developed By: x Piping Manufacturer Industry Standard 01 Professional Engineer <br />n <br />Test Method Used: x Pressure Vacuum Hydrostatic <br />other ��Specify) <br />Test Equipment tjsadi4-dial gauge <br />Equipment Resolution:0-15 <br />psi <br />Piping Run <br />ANNY, Mi,5 <br />Piping Run 4 <br />Piping Run 9 <br />Piping Run <br />Satellite #1 <br />Piping Material: Plastic <br />Piping Manufacturer: DPW <br />Piping Diameter: — 1 1/21, <br />Length of Piping Run: 20' <br />product Stored: Diesel <br />Method and location of <br />Test boots in UDC's <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />10 minutes <br />Test Start Time: <br />9:00 <br />Initial Reading (R,): <br />'rest End Time: <br />5.0 psi <br />10:00 <br />Final Reading (&T): <br />5.0 psi <br />I hour <br />0 <br />Test Duration: <br />Change in Reading (RF -RI): <br />jIT Id r <br />Pass//Fail Threshold or <br />0 <br />Criteria: <br />est Result: <br />Testt esult. <br />x Pass 0 Fail <br />Pass 0, Fail <br />Pass 0 Fail n Pass 0 Fail <br />.......... <br />Comments — (include information un repairs made prior to testing and recommended fo11ow-!ELorfailed tests) <br />