My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012 - 2014
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRESNO
>
1524
>
2300 - Underground Storage Tank Program
>
PR0506545
>
COMPLIANCE INFO_2012 - 2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2019 11:18:53 AM
Creation date
9/24/2018 11:22:01 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO_2012 - 2014
FileName_PostFix
2012 - 2014
RECORD_ID
PR0506545
PE
2361
FACILITY_ID
FA0007491
FACILITY_NAME
VALLEY PACIFIC FRESNO AVE CARDLOCK
STREET_NUMBER
1524
STREET_NAME
FRESNO
STREET_TYPE
AVE
City
STOCKTON
Zip
95206
APN
16337025
CURRENT_STATUS
01
SITE_LOCATION
1524 FRESNO AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />7. T1NDrR-n1P%PFNSER CONTAMENT ( <br />Test Method Developed By. ❑ UDC Manufacturer x industry Standard <br />CI Other (Specify) <br />Test Method Used: C Pressure (7 Vacuum <br />❑ Other (Specify) <br />Test Equipment Used:lncon is-sts <br />UDC Manut`acturer: <br />UTC Material: <br />UDC De the <br />Height from UDC Bottom to Top <br />of Il.ighest Pipin�Z Penetration: <br />Height from UDC Bottom to <br />Lowest Flectri.cal Penetration: <br />Condition of UDC prior to <br />testing: <br />Portion of UDC Tested <br />Does turbine shut down when <br />UT)C sensor detects liquid (both <br />product and water)?* <br />Turbine shutdown res onse titre <br />Is system programmed for fail- <br />safe shutdown?* <br />Was Fail-safe verified to be <br />operationaW <br />Wait time between applying <br />pressure/vacuurn/water and <br />starting test <br />UUC #112 _ UAC #314 <br />Egviron <br />r Poly^� <br />34" <br />20" <br />0" <br />Page _„_ of <br />LI Professional Engineer <br />x Hydrostatic <br />ment Resolution: .00I" <br /># UDC # <br />Test Start Time: l 1:45 <br />Initial Reading Rr) 6.307 <br />Test Bnd Time: 12:00 <br />Final Readin (Ru): 6306 <br />Test Duration: 15 Min <br />Change in Reading (RF -Rs): 0 <br />_., <br />Pass/Fail Threshold or Criteria: 0,001 C3 Postd.Trat1 <br />Test Roulit: X Pags U Fail CI Pass ❑ Fail n Paaa L1. . <br />Was sensor removed for testing? X Yes P No C-1 ❑ Yes ❑ No 0, NA ❑ Yes 1.1 No DNA ❑Yes ❑ No 0 N <br />NA <br />Was sensor properly repiaced and -Xyes El No ❑ ❑ Yes ❑ No 177 -NA ❑ Yes ❑ No ❑N❑Yes ❑ No 11 NA <br />verified functional after testing? NA <br />Commentsinclude i�� orm.ation o rre airs ,nade prior fo lestil!& and reeomrnertded, fnllou -up fvr failed Tests) <br />&DJ.ace all electrical Denetlr_ation . <br />' Tfthe entire depth of the UDC isnot tested, specify how much was tested. If the answer to any. of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire UDC must be. tested. (See SWRCB LG -1.60) <br />x Yes J No I'1 NA <br />❑ Yes ❑ No ❑❑ <br />❑Yes ❑ No ❑ NA <br />Yes ❑ No ❑ <br />NA <br />N,4 <br />3 sec <br />[]Yes ❑ No 11 <br />©Yes ❑ No ❑ <br />a Yes ❑ No ❑ <br />x Yes Cl No f3 NA <br />NA <br />NA <br />NA <br />x Yes ❑ No DNA <br />Yes F No F10yes <br />0 No Ll NA <br />11 Yes i1 No ❑ <br />NA <br />NA <br />15 min. <br />Test Start Time: l 1:45 <br />Initial Reading Rr) 6.307 <br />Test Bnd Time: 12:00 <br />Final Readin (Ru): 6306 <br />Test Duration: 15 Min <br />Change in Reading (RF -Rs): 0 <br />_., <br />Pass/Fail Threshold or Criteria: 0,001 C3 Postd.Trat1 <br />Test Roulit: X Pags U Fail CI Pass ❑ Fail n Paaa L1. . <br />Was sensor removed for testing? X Yes P No C-1 ❑ Yes ❑ No 0, NA ❑ Yes 1.1 No DNA ❑Yes ❑ No 0 N <br />NA <br />Was sensor properly repiaced and -Xyes El No ❑ ❑ Yes ❑ No 177 -NA ❑ Yes ❑ No ❑N❑Yes ❑ No 11 NA <br />verified functional after testing? NA <br />Commentsinclude i�� orm.ation o rre airs ,nade prior fo lestil!& and reeomrnertded, fnllou -up fvr failed Tests) <br />&DJ.ace all electrical Denetlr_ation . <br />' Tfthe entire depth of the UDC isnot tested, specify how much was tested. If the answer to any. of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire UDC must be. tested. (See SWRCB LG -1.60) <br />
The URL can be used to link to this page
Your browser does not support the video tag.