Laserfiche WebLink
San Joaquin County <br />Environmental Health Department DIRECTOR <br />Donna Heran, REHS <br />1868 East Hazelton Avenue <br />Stockton, California 952056232 PROGRAM COORDINATORS <br />Robert McClellon, REHS <br />1%?? <br />Jeff Carruesco, REHS, RDI <br />cq �j�P Website: www.sjgov.org/ehd Foley, RENS <br />F o R Linda Turkatte, REHS <br />May 14, 2012 Phone: (209) 468-3420 <br />Fax: (209) 464-0138 <br />Josh Simmons <br />Kern County Construction, Inc. <br />PO Box 6096 cy FILECOPY <br />Bakersfield, CA 93386 <br />Re: Valley Pacific Petroleum — Fresno Ave Cardlock SR0064613 <br />1524 Fresno Ave., Stockton <br />The San Joaquin County Environmental Health Department (EHD) has completed the review of <br />the application for a permit to replace the piping to the satellite #1 dispenser, and remove and <br />reinstall dispensers #1/2 and 3/4 on the underground storage tank (UST) systern at the above <br />noted address. The permit has been approved with the following conditions: <br />1. Contact the local fire department and the San Joaquin Valley Air Pollution Control <br />District for any applicable permits and requirements. <br />2. Any changes in information and scope of work must be submitted to EHD for approval <br />prior to commencing work. All new addenda supersede the previous ones. <br />3. Contact Stacy Rivera at (209) 468-3440 to arrange the following inspection <br />appointments (a 48-hour notice is required for inspection appointments). Please be <br />aware that inspections for emergency work must be scheduled within five days of permit <br />approval. <br />a. Primary piping soap test: One hour pneumatic pressure test at 110% of operating <br />pressure, or 40 psi, whichever is greater <br />b. Secondary piping soap test: One hour pressure test per manufacturer's guidelines. If <br />there are no manufacturer's guidelines, Lest shall be performed using an applicable <br />method specified in an industry code or engineering standard <br />c. Witness soil sampling <br />d. Visual inspection of diesel piping within dispensers <br />Please be aware that the facility cannot operate the; UST prior to he, fal-iD <br />inspection and approval. <br />4. If concrete will be broken near the USTs and/or piping, a secondary containment test <br />must be performed on the affected USTs/piping once concrete is poured in accordance <br />with the manufacturer's guidelines. <br />5. Secondary containment testing for the replaced piping is required six months after <br />installation. Provide 48 hours notification to the EHD when tris test is scheduled. <br />