Matrix of Nonmetallic Pipe Monitoring Applications
<br />Gravity Flow, Vacuum (V), Pressure (P), and Interstitial Liquid Level Monitoring (ILLM)
<br />(Enclosure to State Water Board letter dated February 29, 2008; Matrix Updated January 16, 2014)
<br />1. Use only with Ameron's Brine Filled Interstitial Space Monitoring System (limited to maximum length of 344 feet).
<br />2. Use only with Western Fiberglass Co -Flow Hydraulic Interstitial Monitoring System (limited to maximum length of 200 feet).
<br />3. Procedures to verify the appropriate pipe for V or P applications include inspection in the field for a date stamp equal to or after November 30, 2006, and a marking of "50 PSI" on
<br />the secondary containment.
<br />4. Procedures to verify the appropriate pipe for V and P applications include inspection in the field for a date stamp equal to or after January 29, 2008 and a marking of 50 PSI" on the
<br />secondary containment.
<br />5. Procedures to verify the appropriate pipe for V or P applications include inspection in the field for a date stamp equal to or after November 16, 2006, and a marking of "50 PSI" on
<br />the secondary containment.
<br />6. E85 is covered within the CT fuels testing range; therefore only pipe with the CT fuels marking can store E85.
<br />L 971 pipe date 'stamped an er'`a er July 1, 26
<br />Fuels6 Open .N Closed
<br />Secondary Containment
<br />Brand
<br />Type and Size
<br />(min. 5 psi rating on SC per UL) (min. 50 psi rating on SC per UL)
<br />(Coaxial reported as ID of PS;
<br />SOS reported as OD of SC)
<br />Gravity Flow or Vacuum, Pressure, or
<br />Ambient ILLM Pressurized ILLM
<br />Advantage Earth Products, Inc.
<br />Electr-O-Fuze
<br />Flexible; Coaxial (coil); Black 11/2", 2"
<br />MV,CT,HB,AM
<br />Gravity Flow
<br />V,P
<br />Franklin Fueling/APT
<br />XP -150 -SC
<br />Flexible; Coaxial (coil); 11/2"
<br />MV,CT,HB,AM
<br />Gravity Flow
<br />V
<br />XP -100, 175, 200
<br />Flexible; Coaxial (coil); 1", 13/4", 2"
<br />MV,CT,HB,AM
<br />Gravity Flow
<br />None
<br />UPP
<br />Flexible; Coaxial (coil); 11/2", 2"
<br />MV,CT,HB,AM
<br />Gravity Flow
<br />V, P
<br />Flexible; Coaxial (sticks); 11/2" 2" 3" 4"
<br />MV,CT,HB,AM
<br />Gravity Flow
<br />V P
<br />NOV Fiber Glass Systems
<br />Dualoy 3000/L
<br />Rigid; SOS; 3", 4"
<br />MV,CT,HB,AM
<br />Gravity Flow
<br />V, P
<br />(Ameron)
<br />Rigid; SOS; 6"
<br />MV,CT,HB,AM
<br />Gravity Flow
<br />None
<br />Dualoy 3000/LCX
<br />Rigid; Coaxial (sticks); 2", 3"
<br />MV,CT,HB,AM
<br />Gravity Flow, AILLM1
<br />V, P, PILLMZ
<br />(Ameron)
<br />Rigid; Coaxial (sticks); 4"
<br />MV,CT,HB,AM
<br />Gravity Flow, AILLMI
<br />None
<br />Red Thread IIA
<br />Rigid; SOS; 3", 4"
<br />MV,CT,HB,AM
<br />Gravity Flow
<br />V, P
<br />Smith Fiberglass)
<br />Rigid; SOS; 6"
<br />MV,CT,HB,AM
<br />Gravity Flow
<br />None
<br />NUPI
<br />Smartflex
<br />Flexible; Coaxial (coil); 11/4", 11/2", 2"
<br />MV,CT,HB,AM
<br />Gravity Flow
<br />V, P
<br />Flexible; Coaxial (sticks); 11/2", 2"
<br />MV,CT,HB,AM
<br />Gravity Flow
<br />V, P
<br />Rigid over Flexible; Coaxial sticks • 3" 4"
<br />MV,CT,HB,AM
<br />Gravity Flow
<br />V P
<br />OPW-FCS
<br />C15, C20, C30
<br />Flexible; Coaxial (coil); 11/2", 2", 3"
<br />MV,AM
<br />Gravity Flow
<br />None
<br />C75, C104
<br />Flexible; Coaxial (coil); 3/4", 1"
<br />MV,AM
<br />Gravity Flow
<br />V, P
<br />PGFC-21505
<br />Flexible; Coaxial coil • 11/2"
<br />MV,AM
<br />Gravity Flow
<br />V P
<br />festern Fiberglass
<br />Co -Flex
<br />Flexible; Coaxial (coil); 11/2 2", & 3"
<br />MV,AM
<br />Gravity Flow, AILLMz
<br />None
<br />Co-Flex4
<br />Flexible; Coaxial (coil); 3/4", 1"
<br />MV,AM
<br />Gravity Flow, AILLMz
<br />V, P, PILLMZ
<br />Co-Flex3
<br />Flexible; Coaxial coil • 11/2
<br />MV,AM
<br />Gravity Flow AILLMz
<br />V P PILLMZ
<br />1. Use only with Ameron's Brine Filled Interstitial Space Monitoring System (limited to maximum length of 344 feet).
<br />2. Use only with Western Fiberglass Co -Flow Hydraulic Interstitial Monitoring System (limited to maximum length of 200 feet).
<br />3. Procedures to verify the appropriate pipe for V or P applications include inspection in the field for a date stamp equal to or after November 30, 2006, and a marking of "50 PSI" on
<br />the secondary containment.
<br />4. Procedures to verify the appropriate pipe for V and P applications include inspection in the field for a date stamp equal to or after January 29, 2008 and a marking of 50 PSI" on the
<br />secondary containment.
<br />5. Procedures to verify the appropriate pipe for V or P applications include inspection in the field for a date stamp equal to or after November 16, 2006, and a marking of "50 PSI" on
<br />the secondary containment.
<br />6. E85 is covered within the CT fuels testing range; therefore only pipe with the CT fuels marking can store E85.