Laserfiche WebLink
Matrix of Nonmetallic Pipe Monitoring Applications <br />Gravity Flow, Vacuum (V), Pressure (P), and Interstitial Liquid Level Monitoring (ILLM) <br />(Enclosure to State Water Board letter dated February 29, 2008; Matrix Updated January 16, 2014) <br />1. Use only with Ameron's Brine Filled Interstitial Space Monitoring System (limited to maximum length of 344 feet). <br />2. Use only with Western Fiberglass Co -Flow Hydraulic Interstitial Monitoring System (limited to maximum length of 200 feet). <br />3. Procedures to verify the appropriate pipe for V or P applications include inspection in the field for a date stamp equal to or after November 30, 2006, and a marking of "50 PSI" on <br />the secondary containment. <br />4. Procedures to verify the appropriate pipe for V and P applications include inspection in the field for a date stamp equal to or after January 29, 2008 and a marking of 50 PSI" on the <br />secondary containment. <br />5. Procedures to verify the appropriate pipe for V or P applications include inspection in the field for a date stamp equal to or after November 16, 2006, and a marking of "50 PSI" on <br />the secondary containment. <br />6. E85 is covered within the CT fuels testing range; therefore only pipe with the CT fuels marking can store E85. <br />L 971 pipe date 'stamped an er'`a er July 1, 26 <br />Fuels6 Open .N Closed <br />Secondary Containment <br />Brand <br />Type and Size <br />(min. 5 psi rating on SC per UL) (min. 50 psi rating on SC per UL) <br />(Coaxial reported as ID of PS; <br />SOS reported as OD of SC) <br />Gravity Flow or Vacuum, Pressure, or <br />Ambient ILLM Pressurized ILLM <br />Advantage Earth Products, Inc. <br />Electr-O-Fuze <br />Flexible; Coaxial (coil); Black 11/2", 2" <br />MV,CT,HB,AM <br />Gravity Flow <br />V,P <br />Franklin Fueling/APT <br />XP -150 -SC <br />Flexible; Coaxial (coil); 11/2" <br />MV,CT,HB,AM <br />Gravity Flow <br />V <br />XP -100, 175, 200 <br />Flexible; Coaxial (coil); 1", 13/4", 2" <br />MV,CT,HB,AM <br />Gravity Flow <br />None <br />UPP <br />Flexible; Coaxial (coil); 11/2", 2" <br />MV,CT,HB,AM <br />Gravity Flow <br />V, P <br />Flexible; Coaxial (sticks); 11/2" 2" 3" 4" <br />MV,CT,HB,AM <br />Gravity Flow <br />V P <br />NOV Fiber Glass Systems <br />Dualoy 3000/L <br />Rigid; SOS; 3", 4" <br />MV,CT,HB,AM <br />Gravity Flow <br />V, P <br />(Ameron) <br />Rigid; SOS; 6" <br />MV,CT,HB,AM <br />Gravity Flow <br />None <br />Dualoy 3000/LCX <br />Rigid; Coaxial (sticks); 2", 3" <br />MV,CT,HB,AM <br />Gravity Flow, AILLM1 <br />V, P, PILLMZ <br />(Ameron) <br />Rigid; Coaxial (sticks); 4" <br />MV,CT,HB,AM <br />Gravity Flow, AILLMI <br />None <br />Red Thread IIA <br />Rigid; SOS; 3", 4" <br />MV,CT,HB,AM <br />Gravity Flow <br />V, P <br />Smith Fiberglass) <br />Rigid; SOS; 6" <br />MV,CT,HB,AM <br />Gravity Flow <br />None <br />NUPI <br />Smartflex <br />Flexible; Coaxial (coil); 11/4", 11/2", 2" <br />MV,CT,HB,AM <br />Gravity Flow <br />V, P <br />Flexible; Coaxial (sticks); 11/2", 2" <br />MV,CT,HB,AM <br />Gravity Flow <br />V, P <br />Rigid over Flexible; Coaxial sticks • 3" 4" <br />MV,CT,HB,AM <br />Gravity Flow <br />V P <br />OPW-FCS <br />C15, C20, C30 <br />Flexible; Coaxial (coil); 11/2", 2", 3" <br />MV,AM <br />Gravity Flow <br />None <br />C75, C104 <br />Flexible; Coaxial (coil); 3/4", 1" <br />MV,AM <br />Gravity Flow <br />V, P <br />PGFC-21505 <br />Flexible; Coaxial coil • 11/2" <br />MV,AM <br />Gravity Flow <br />V P <br />festern Fiberglass <br />Co -Flex <br />Flexible; Coaxial (coil); 11/2 2", & 3" <br />MV,AM <br />Gravity Flow, AILLMz <br />None <br />Co-Flex4 <br />Flexible; Coaxial (coil); 3/4", 1" <br />MV,AM <br />Gravity Flow, AILLMz <br />V, P, PILLMZ <br />Co-Flex3 <br />Flexible; Coaxial coil • 11/2 <br />MV,AM <br />Gravity Flow AILLMz <br />V P PILLMZ <br />1. Use only with Ameron's Brine Filled Interstitial Space Monitoring System (limited to maximum length of 344 feet). <br />2. Use only with Western Fiberglass Co -Flow Hydraulic Interstitial Monitoring System (limited to maximum length of 200 feet). <br />3. Procedures to verify the appropriate pipe for V or P applications include inspection in the field for a date stamp equal to or after November 30, 2006, and a marking of "50 PSI" on <br />the secondary containment. <br />4. Procedures to verify the appropriate pipe for V and P applications include inspection in the field for a date stamp equal to or after January 29, 2008 and a marking of 50 PSI" on the <br />secondary containment. <br />5. Procedures to verify the appropriate pipe for V or P applications include inspection in the field for a date stamp equal to or after November 16, 2006, and a marking of "50 PSI" on <br />the secondary containment. <br />6. E85 is covered within the CT fuels testing range; therefore only pipe with the CT fuels marking can store E85. <br />