Laserfiche WebLink
SAN JOAQUIN COUNTY <br />ENVIRONMENTAL HEALTH DEPARTMET <br />600 East Main Street, Stockton, CA 95202-3029 <br />Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www.sjgov.or /g ehd <br />FACILITY NAME <br />FACILITY CONTACT NAME <br />Valley Pacific Fresno Ave Cardlock <br />Mike Eliason <br />FACILITY ADDRESS <br />SITE PHONE # WITH AREA CODE <br />1524 Fresno Ave <br />209 993-8793 <br />CITY STATE <br />ZIP CODE <br />MOF TANKS AT SITE <br />Stockton CA <br />95206 <br />9206 Closure Installation Cgepair Retrofit <br />APPLICANT BILLING NAME <br />APPLICANT CONTACT NAME <br />Valley Pacific Petroleum Services, Inc <br />Mike Eliason <br />APPLICANT MAILING ADDRESS <br />APPLICANT PHONE # WITH AREA CODE <br />166 Frank West Circle <br />209 993-8793 <br />CITY <br />STATE <br />ZIP CODE CIRCLE WORK TO BE DONE CONTRACTOR ICC # <br />Stncktnn <br />CA <br />9206 Closure Installation Cgepair Retrofit <br />ACTIVE FACILITY <br />TANK ID # (s): <br />CLOSURE FEE = $375 / TANK <br />2007 <br />2008 <br />2009 <br />2010 <br />2011 <br />2012 <br />$ <br />$500 FEE INCLUDES FACILITY FEE + 1 TANK (2007-2008) <br />PIPING REPAIR FEE = $375 / FACILITY (use for piping, under -dispenser containment, ect.) <br />$550 FEE INCLUDES FACILITY FEE + 1 TANK (2009-2012) <br />$ <br />$125 PER TANK AFTER FIRST TANK <br />$ <br />TANK PENALTY ASSESSED <br />$ <br />TANK SURCHARGE = $15 / TANK <br />$ <br />STATE SURCHARGE FOR FACILITIES NOT ALREADY ON INVENTORY IN A CUPA PROGRAM =$49.00/ FACILITY <br />PERMANENT CLOSURE <br />Removal or Permitted Closure in Place <br />TANK ID # (s): <br />CLOSURE FEE = $375 / TANK <br /># TANKS X $375 = <br />TEMPORARY CLOSURE <br />Plan Review and Inspections) <br />TANK ID # (s) : <br />TEMPORARY CLOSURE FEE = $375 / FACILITY <br />INSTALLATION PLAN CHECK <br />Plan Check and Construction Inspections) <br />TANK ID # (s) : <br />PLAN CHECK FEE = $1000 / FACILITY <br />REPAIR PLAN CHECK <br />TANK ID # (s) : <br />$ <br />CONSULTATION FEE = $ 125/ HOUR <br />TANK RETROFIT REPAIR FEE = $375 / FACILITY (use for monitoring equipment, cold starts, EVR upgrades, <br />UNAUTHORIZED RELEASE EVALUATION FEE = $ 125 / HOUR <br />spill buckets, sumps, misc.) <br />SAMPLING INSPECTION FEE = $ 125/ HOUR <br />$ <br />PIPING REPAIR FEE = $375 / FACILITY (use for piping, under -dispenser containment, ect.) <br />MISCELLANEOUS <br />TRANSFER FEE _ $ 25 <br />$ <br />CONSULTATION FEE = $ 125/ HOUR <br />$ <br />UNAUTHORIZED RELEASE EVALUATION FEE = $ 125 / HOUR <br />$ <br />SAMPLING INSPECTION FEE = $ 125/ HOUR <br />$ <br />ALL FEES ARE BASED ON THE $125 HOURLY RATE. TIME THAT EXCEEDS FEES PAID WILL BE BILLED TO APPLICANT. <br />TOTAL AMOUNT DUE I $ <br />OFFICE USE ONLY <br />SERVICE REQUEST # I FACILITY ID I AMOUNT RECEIVED I CHECK # I RECEIVED BY I DATE RECEIVED <br />EH 23 032 (REVISED 04113112 by KF) <br />