My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Z
>
ZEPHYR
>
1010
>
2800 - Aboveground Petroleum Storage Program
>
PR0527747
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2018 4:15:16 PM
Creation date
9/24/2018 3:45:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0527747
PE
2831
FACILITY_ID
FA0009525
FACILITY_NAME
INGREDION INCORPORATED
STREET_NUMBER
1010
STREET_NAME
ZEPHYR
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17728013
CURRENT_STATUS
02
SITE_LOCATION
1010 ZEPHYR ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
EJimenez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
O P4U(1y C <br />_, •.� SAN JOAQUIN COUNTY <br />(U): ENVIRONMENTAL HEALTH DEPARTMENT <br />IN: 600 East Main Street, Stockton, CA 95202-3029 <br />Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www.sjgov.org/ehd <br />ASF O R?� <br />OFFICIAL INSPECTION REPORT <br />FACILITY NAME/TYPE: Air Products Mfg Corp <br />DATE' Jun 3, 2011 <br />ADDRESS: 1010 Zephyr St <br />CITY: Stockton <br />ZIP CODE: 95206 <br />OWNER/OPERATOR: Plant Manager: Glenn Sizemore <br />TELEPHONE #: (209) 983-0391 <br />TYPE OF INSPECTION: ❑ COMPLAINT ❑ CONSULTATION 0OTHER <br />PROGRAM 2831 <br />ELEMENT: <br />FRECORD PR0052774 <br />NATURE OF COMPLAINT/CONSULTATION: <br />5J20@-) <br />This facility has gallons of aboveground petroleum shell capacity and is regulated under the <br />Aboveground Petroleum Storage Act (APSA). <br />Facilities with 1320 gallons or greater of APSA regulated shell capacity must prepare and implement <br />a Spill Prevention Countermeasure & Control (SPCC) Plan. <br />OBSERVATIONS/COMMENTS: <br />This facility has a SPCC Plan on site with a date of November 10, 2010. The plan is lacking the <br />certification by the professional engineer. According to Mr. Sizemore, this plan is not due to be <br />approved until November 2011. A certified SPCC Plan could not be located on site at the time of <br />inspection. <br />CORRECTIVE ACTIONS: <br />Immediately obtain a current, certified copy of the SPCC Plan, maintain a copy on site at all times, <br />and implement this Plan as necessary. <br />CORRECT BY: Immediately <br />INSPECTED <br />RECEIVED BY: f taw <br />DATE: s� l <br />E <br />1-11D <br />EHD 48-05 Rev. 08/10/10 INSPECTION REPORT <br />
The URL can be used to link to this page
Your browser does not support the video tag.