Laserfiche WebLink
cy') <br /> 0 <br /> MANAGEMENT APPROVAL AND CERTIFICATION <br /> I M;1nigionlent Approval <br /> 0 <br /> ins r an and is tLilly prepared 10 commit the necessary 0 <br /> -n' Plls r130 J_ <br /> a- <br /> -1; ,;PCC Plain for tl-e McDonald Island Underground <br /> facility modificat:oris indicated under the Facility <br /> ecl on of Part I of this SPCC plan will be completed within six <br /> -r I also certify under penalty of law that I have <br /> i_S.D n ired and 7t-i far-- -0 the information submitted(included) for the <br /> 3r ,t Ine Substantial H3rn-. —ria Analysis. and that based on my inquiry of <br /> ,als respor.sirDle for obt3 7 this information, I believe that the Submitted <br /> 0s! accurate and complete <br /> 0 WC Date <br /> 4-- <br /> W 1 1 s Tonetti <br /> clistfict Supervisor <br /> 0 <br /> cl� 2 Professional Engineer Certification <br /> is 31 11iis c- :Iihration I as.3 Professional Engineer, attest to the following <br /> L_ : Tn faimWX -o!h the provisions of 40 CFR Part 112. <br /> N fac.l:ly has been visited and examined by me or my agent, <br /> C) 'r.s Plan has been prepared in accordance with good engineering practice, W <br /> rlcuding cons idetalion of applicable industry standards, and with The <br /> cLJements of this part <br /> z ca <br /> '"E' proce, <br /> :Jures for feqUaed inspections and testing have been established, <br /> ,ran is adequate for the facility. and <br /> ",'an was,prepared based on information provided by PG&E and ETIC <br /> j.".W-ering Inc s inspection of the McDonald island Underground Natural Gas <br /> Uj ayr. Facility on February 9 and 16 2010 <br /> 06 ""ll-,i,�; Tt,jratiajah PE iETIC Engineering.Inc <br /> 0 <br /> i Name of Licensed Professional Engineer <br /> I. erd Professional Engineer ate <br /> HU <br /> JIt4 Stale CA <br /> C <br /> • <br /> EV • <br /> V civil- <br /> Aro,CAL* <br />