Laserfiche WebLink
TANK INTEGRITY <br /> INSPECTION AND/OR TESTING SCHEDULE <br /> FOR MCDONALD ISLAND UNDERGROUND GAS STORAGE <br /> Tank Category <br /> Above Volume per Type of Fluid Purpose Type of Sill Type of Continuous Categor� <br /> Oil container Control la Release Defection (112/3)�e <br /> Storage (gaftcn) Method(CRDM)(a� <br /> Tank No. _ <br /> 1 2,000 Waste oil Hazardous waste Tank double Visual 1 <br /> wall <br /> 2 6,500 Production Interim Storage Curb Visual 1 <br /> fluids <br /> 3 1.000 Diesel Fueling Tank double Visual 1 <br /> wall <br /> 4 5W IO�eBel Emergency Containers Visual 1 <br /> generator fuel <br /> 5 W Cowl Emergency Containers Visual 1 <br /> generator fuel <br /> 6 ` x1Q ` l3rsoline Fueling Tank double Visual 1 <br /> wall <br /> 7 24 ' ',eline Interim Storage Secondarily Visual 1 <br /> ids contained <br /> facility <br /> 8 ;~ auction Interim Storage Curb Visual 1 <br /> 9 '.�_ iC ; .eduction Interim Storage Curb Visual 1 <br /> 10 . `�tE Tction Interim Storage Curb Visual 1 <br /> 11 suction Interim Storage Curb Visual 1 <br /> �1os <br /> 12 _f fiction Interim Storage Curb Visual 1 <br /> 13 Sa , r--.;duction Interim Storage Curb Visual 1 <br /> %§=(Oily <br /> i rAlal�er/brine <br /> 14 1,000 P oduction Interim Storage Curb Visual 1 <br /> 15 470 Pvwu-ction Interim Storage Curb Visual 1 <br /> 16 520 f -",-oduction Interim Storage Curb Visual 1 <br /> mos <br /> 17 520 production Interim Storage Curb Visual 1 <br /> fluids <br /> 18 570 Production Interim Storage Curb Visual 1 <br /> fluids <br /> 19 520 Production interim Storage Curb Visual 1 <br /> fluids <br /> 20 520 Production Interim Storage Curb Visual 1 <br /> fluids <br /> 21 520 Production Interim Storage Curb Visual 1 <br /> fluids <br /> 22 520 Production Interim Storage Curb Visual 1 <br /> fluids <br /> 23 1,080 Production Interim Storage Curb Visual 1 <br /> fluids <br /> fnsp-Testing Schedule-McDonald Is UG Gas Storage-Decl 1.doc 115 Version:December 21,2011 <br />