Laserfiche WebLink
TANK TRUCK LOADING/UNLOADING CHECKLIST <br />Complete the inspection checklist for all items indicated. Upon completion, copies should be retained <br />at the Facility for a minimum of three years. <br />Name of Facilitv: McDonald Island GomDressor Station <br />Name of Transporter.�,s-�,. <br />PRE -LOADING: <br />,-met brakes and block wheels on truck. <br />Drains and outlets on truck tank checked for leakage. <br /><!1Absorbent material on hand. <br />Transfer hose connection checked for tightness. <br />LOADING: <br />Hose and connections checked for leaks during transfer. <br />�Z Liquid level in tank (truck) monitored to prevent overfilling. <br />POST -LOADING: <br />__,,,,Transfer hose disconnected and drained. <br />_Storage tank valve plugged. <br />_ Drains and outlets on tank truck checked for leakage. <br />Check to insure the truck was free and clear of the transfer facility prior to departure. <br />UPON COMPLETION OF CHECKLIST ACTIVITIES, SIGN AND DATE THIS FORM. <br />Signature:4i <br />Date: <br />Exterran Energy solutions <br />McDonald island Compressor Statin B-8 July 2009 <br />