Laserfiche WebLink
TAMK TRUCK LOADING/UNLOADING CHECKLIST <br />Complete the inspection checklist for all items indicated_ Upon completion, copies should be retained <br />at the Facility for a minimum of three years. <br />Name of Facility: McDonald Island Comoressor Station <br />Name of Transporter: <br />PRE -LOADING: <br />Set brakes and block wheels on truck. <br />✓ Drains and outlets on truck tank checked for leakage. <br />Absorbent material on hand. <br />—7 Transfer hose connection checked for tightness. <br />LOADING: <br />J Hose and connections checked for leaks during transfer. <br />�. Liquid level in tank (truck) monitored to prevent overfilling. <br />POST -LOADING: <br />i Transfer hose disconnected and drained, <br />I/ Storage tank valve plugged. <br />_ Drains and outlets on tank truck checked for leakage. <br />_ Check to insure the truck was free and clear of the transfer facility prior to departure. <br />UPON COMPLETION OF CHECKLIST ACTIVITIES, SIGN AND DATE THIS FORM. <br />Signature: <br />uaate: C' <br />Exterran Energy Solutions <br />McDonald Island Compressor Station B-8 July 2009 <br />