Laserfiche WebLink
TAW TRUCK LOACINGIUNLOADING CHE^KLIST <br />Complete the inspection checklist for all items indicated. Upon completion, copies should be retained <br />at the Facility for a minimum of three years. <br />Name of Facility: McDonald Island Compressor Station <br />Name of Transporter: <br />PRE -LOADING: <br />-Set brakes and block wheels on truck. <br />—Drains and outlets on truck tank checked for leakage. <br />/Absorbent material on hand. <br />7 Transfer hose connection checked for tightness. <br />LOADING: <br />Hose and connections checked for leaks during transfer. <br />_Z Liquid level in tank (truck) monitored to prevent overfilling. <br />POST -LOADING: <br />Transfer hose disconnected and drained. <br />X Storage tank vaive plugged. <br />-Drains and outlets on tank truck checked for leakage. <br />-/ Check to insure the truck was free and clear of the transfer facility prior to departure. <br />UPON COMPLETION OF CHECKLIST ACTIVITIES, SIGN AND DATE THIS FORM. <br />Signature:_ Date: <br />Exterran Energy Solutions <br />McDonald island Compressor Station 3-8 July 2009 <br />