Laserfiche WebLink
TANK TRUCK LOADINGIUNLOADING CHECKLIST <br />Complete the inspection checklist for all items indicated. Upon completion, copies should be retained <br />at the Facility for a minimum of three years. <br />Name of Facility: McDonald Island Compressor Station <br />Name of Transporter. ;l, z4i <br />PRE -LOADING: <br />Set brakes and block wheels on truck. <br />_Drains and outlets on truck tank checked for leakage. <br />'Absorbent material on hand. <br />Transfer hose connection checked for tightness. <br />LOADING: <br />,Hose and connections checked for leaks during transfer. <br />Liquid level in tank (truck) monitored to prevent overfilling. <br />POST -LOADING: <br />Transfer hose disconnected and drained. <br />/Storage tank valve plugged. <br />Drains and outlets on tank truck checked for leakage. <br />Check to insure the truck was free and clear of the transfer facility prior to departure. <br />UPON COMPLETION OF CHECKLIST ACTIVITIES, SIGN AND DATE THIS FORM. <br />Signature: <br />Date: e,", <br />Exterran Energy Solutions <br />McDonald Island Compressor Station B-8 July 2009 <br />