Laserfiche WebLink
TAW TRUCK LOADING/UNLOADING CHECKLIST <br />Complete the inspection checklist for all items indicated_ Upon completion, copies should be retained <br />at the Facility for a minimum of three years. <br />Name of Facility: McDonald Island Compressor Station <br />Name of Transporter: <br />PRE -LOADING: <br />V ISet brakes and block wheels on truck- <br />�` Drains and outlets on truck tank checked for leakage. <br />17 Absorbent material on hand. <br />Transfer hose connection checked for tightness. <br />LOADING. <br />Hose and connections checked for leaks during transfer. <br />Liquid level in tank (truck) monitored to prevent overfilling. <br />POST-LOADING.- <br />Transfer <br />OST-LOADING:Transfer hose disconnected and drained. <br />—� Storage tank valve plugged. <br />Drains and outlets on tank truck checked for leakage. <br />Check to insure the truck was free and clear of the transfer facility prior to departure. <br />UPON COMPLETION OF CHECKLIST ACTIVITIES, SIGN AND DATE THIS FORM. <br />Signature: r Date: ! l r `r <br />Extarran FnerOY Solutions <br />McDonald Island Compressor Station B-8 July 2009 <br />