Laserfiche WebLink
TAM.K TRUCK LOADINGIUN LOADING CHECKLIST <br />Complete the inspection checklist for all items indicated. Upon completion, copies should be retained <br />at the Facility for a minimum of three years. <br />Name of Facility: McDonald Island Compressor Station <br />Name of Transporter: <br />PRE -LOADING: <br />v� Set brakes and block wheels on truck. <br />✓" Drains and outlets on truck tank checked for leakage. <br />1Z Absorbent material on hand. <br />L Transfer hose connection checked for tightness. <br />LOADING. <br />i' Hose and connections checked for leaks during transfer. <br />✓" <br />Liquid level in tank (truck) monitored to prevent overfilling. <br />POST -LOADING: <br />Transfer hose disconnected and drained. <br />Storage tank valve plugged. <br />_ Drains and outlets on tank truck checked for leakage. <br />L Check to insure the truck was free and clear of the transfer facility prior to departure. <br />UPON COMPLETION OF CHECKLIST ACTIVITIES, SIGN AND DATE THIS FORM. <br />..ailYr;7f{ pro' Date:SZ-7 <br />v+�+ <br />EMerran Energy Solutions <br />MCDwald Island Compressor Station B-8 July 2009 <br />