Laserfiche WebLink
TAROK TRUCK LOADINGIUNLOADING CHECKLIST <br />Complete the inspection checklist for all items indicated. Upon completion, copies should be retained <br />at the Facility for a minimum of three years. <br />Name of Facility: McDonald Island Compressor Station <br />Name of Transporter <br />PRE -LOADING: <br />Set brakes and block wheels on truck. <br />Drains and outlets on truck tank checked for leakage. <br />Absorbent material on hand. <br />' Transfer hose connection checked for tightness. <br />LOADING: <br />v' Hose and connections checked for leaks during transfer. <br />Liquid level in tank (truck) monitored to prevent overfilling. <br />POST -LOADING: <br />Transfer hose disconnected and drained. <br />Storage tank valve plugged. <br />Drains and outlets on tank truck checked for leakage. <br />Check to insure the truck was free and clear of the transfer facility prior to departure. <br />UPON COMPLETION OF CHECKLIST ACTIVITIES, SIGN AND DATE THIS FORM. <br />Signature: Date:_ / 61 <br />T <br />Exterran Energy Solutions <br />McDonald Island Compressor Station B-8 .July 2009 <br />