Laserfiche WebLink
Ver. 1 - E-doc-3-18-10 <br />4. Security (excluding oil production facilities) §112.7(g): <br />Table G-6 Implementation and Description of Security Measures <br />Security measures are implemented at this facility to prevent unauthorized access to oil handling, processing, <br />and storage area. I El <br />The following is a description of how you secure and control access to the oil handling, processing and storage areas; <br />secure master flow and drain valves; prevent unauthorized access to starter controls on oil pumps; secure out -of - <br />service and loading/unloading connections of oil pipelines, address the appropriateness of security lighting to both <br />prevent acts of vandalism and assist in the discovery of oil discharges: <br />Oil Handling is secured inside a locked secured shop. <br />Fuel tanks nozzles are locked at the pump. <br />Security lighting is within 100' of all fuel, oil or waste oil. <br />5. Emergency Procedures and Notifications (§112.7(a)(3)(iv) and 112.7(a)(5)): <br />le,G=7 Descrt tion of.Emer enc ,PrQceOL; res.andNotf(cations, <br />The following is a description of the immediate actions to be taken by facility personnel in the event of a discharge to <br />navigable waters or adjoining shorelines (§112.7(a)(3)(iv) and 112.7(a)(5)]: <br />Facility does not adjoin navigable water. <br />Facility Name: Tuff Boy Sales_,_ Inc. <br />Page 6 Tier I Qualified Facility SPCC Plan <br />