Laserfiche WebLink
SAN JOAQUIN COUNTY <br />ENVIRONMENTAL HEALTH DEPARTMENT <br />600 East Main Street, Stockton, California 95202-3029 <br />Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www.sigov.ora/ehd <br />ABOVEGROUND PETROLEUM STORAGE ACT (APSA) PROGRAM INSPECTION REPORT <br />Facility West Valley Chevron <br />Address 2615 West Grant Line Rd, Tracy <br />InspDate: Mar 28, 2011 <br />Facility Steven Mutnick/ Linda Hall <br />Contact: <br />Title: Manager <br />g <br />Phone: 953-7699 <br />AST <br />Content-- <br />Shell <br />Capacity <br />used oil <br />- -.-.... <br />500 <br />5W30 <br />------..------------------------------------ <br />300 <br />gear <br />60 <br />ATF <br />250 <br />10w30 <br />250 <br />5w20 <br />250 <br />HiMile <br />250 <br />Total Facility Shell 1,860 <br />Capacity (gal): <br />SPCC Plan 5 year <br />review date. <br />SPCC Plan type: ❑ APSA SPCC conditionally exempt (HSC 25270.4 5(b)) ❑ Fully or partially Professional Engineer certified ❑X Self -Certified <br />Inspection Type: 0 Routine [—]Follow up ❑Complaint - ID#: <br />(Authority HSC 25270.4) <br />Consent for: Olnspection X Sampling Z Photos Granted by: Linda Hall Title: Manager <br />VIOLATIONS <br /># <br />V <br />R <br />v <br />Code Section <br />HSC = CA Health and SafetyCode, CFR = Code of Federal Regulations; V = Violation: RV = Repeat violation <br />Specific requirements of HSC 25270.4.5(a) are identified as CFR code sections beginning with 112 <br />1 <br />X <br />HSC 25270.4.5(a) <br />Failed to prepare a written SPCC Plan in accordance with CFR Part 112 <br />2 <br />HSC 25270.4.5(a) <br />Failed to conduct periodic inspections of the storage tank to assure compliance with CFR Part 112 <br />3 <br />HSC 25270.6(a) <br />Failed to file business plan or annual tank facility statement if capacity >1 OK gallons and z5% petroleum <br />4 <br />HSC 25270.6(b) <br />Failed to submit APSA fees <br />5 <br />HSC 25270.8 <br />Failed to report spills or releases of 42 gallons or more <br />6 <br />CFR 112.3(d) <br />SPCC Plan certification by a Professional Engineer (PE) missing or incomplete <br />7 <br />CFR 112.3(e) <br />Failed to retain a copy of the SPCC Plan on site <br />8 <br />CFR 112.5(a) <br />Failed to amend SPCC Plan within 6 months, or implement changes within 6 months of amendment when <br />there is an applicable change to the facility <br />9 <br />CFR 112.5(b) <br />Failed to amend SPCC Plan within 6 months, or implement changes within 6 months of amendment after <br />scheduled 5 year Plan review <br />10 <br />CFR 112.5(b) <br />Failed to complete a review and evaluation of SPCC plan at least once every 5 years <br />11 <br />CFR 112.5(c) <br />Failed to have a PE certify technical amendments within 6 months of change <br />12 <br />CFR 112.6 <br />Failed to self -certify technical amendment when there is an applicable change to the: (a)(2) Tier I qualified <br />facility; orb 2 Tier II qualified facility <br />13 <br />X <br />CFR 112.6(a)(3) <br />Tier I qualified facility SPCC Plan incomplete <br />14 <br />CFR 112.6(b)(1) <br />Tier II qualified facility SPCC Plan self certification missing or incomplete <br />15 <br />CFR 112.6(b)(4) <br />Failed to provide written PE certification in a self -certified plan for alternate methods which provide <br />environmental equivalence, or provisions in lieu of secondary containment due to impracticality <br />16 <br />CFR 112.7 <br />SPCC Plan lacks full approval of management at a level of authority to commit the necessary resources to <br />implement the Plan <br />17 <br />CFR 112.7(a)(2) <br />Failed to provide equivalent environmental protection and/or state the reasons for nonconformance and <br />describe the alternate methods and how they achieve equivalent environmental protection <br />18 <br />CFR 112.7(a)(3) <br />No facility diagram or diagram failed to show location and contents of each container, transfer stations, <br />and connecting pipes. <br />19 <br />CFR 112.7(a)(3)(1) <br />SPCC Plan failed to include description of product type and storage capacity for each container <br />20 <br />CFR 112.7(a)(3)(ii) <br />SPCC Plan failed to include procedures for routine handling of products and discharge prevention <br />measures <br />21 <br />CFR 112.7(a)(3)(iiI) <br />SPCC Plan failed to show discharge or drainage controls (secondary containment), equipment, and <br />procedures for the control of a discharge <br />22 <br />CFR 112.7(a)(3)(iv) <br />SPCC Plan failed to show countermeasures for discovery, response and cleanup of discharges <br />23 <br />CFR 112.7(a)(3)(v) <br />SPCC Plan failed to address disposal methods for recovered materials <br />24 <br />CFR 112.7(a)(3)(vi) <br />SPCC Plan failed to include required contact list and phone numbers of the facility's response coordinator, <br />cleanup contractors, and agencies to notify in case of discharge <br />25 <br />CFR 112.7(a)(4) <br />Failed to provide information and procedures to enable a person to adequately report discharges if a <br />response plan was not submitted to the Regional Administrator RA <br />26 <br />CFR 112.7(a)(5) <br />Failed to organize emergency procedures for discharges in a readily useable way if a response plan was <br />not submitted to the RA <br />Inspector. Phone. <br />(209) 468-8257, <br />Received <br />Title. <br />CiL <br />EHD 28-02 Rev 2/19/10 Page 1 APSA INSPECTION REPORT <br />