Laserfiche WebLink
Ms Lon Duncan <br /> April 4, 2000 <br /> . Page 6 of 6 <br /> 2 Develop proposed monitoring wells and conduct two rounds of groundwater monitoring and <br /> sampling to confirm groundwater conditions beneath the site <br /> 3 Submit a technical report The report would summarize well installation, well development, <br /> and groundwater monitoring and sampling activities, and evaluate potential remedial actions <br /> as necessary <br /> CERTIFICATION <br /> Signature of this report certifies that Ground Zero's professional services have been performed, our <br /> findings obtained, and our conclusions prepared in accordance with customary principles and practices <br /> in the fields of environmental science and engineering No hazardous wastes were generated as a result <br /> of these investigations No waste from this investigation will remain on site The analytical laboratory <br /> will ultimately dispose of collected soil samples <br /> This investigation was performed under the direct supervision of John P Lane and Gregory P Stahl, <br /> who have reviewed and approved this report The methods and procedures employed in the <br /> development of this report conform to minimum industry standards <br /> Please contact Ground Zero at your earliest convenience if you have any questions or comments <br /> regarding this report <br /> Sincerely, <br /> Ground Zero Analysis,Inc EO GAO` <br /> D� <br /> JOHN P <br /> Garv �"j c LANCE <br /> Staff Geologist N� No 6 795 q <br /> z' <br /> O <br /> OF CA:0-' <br /> John P Laner-- <br /> CA Re erect Geologi No 6795 x BEV GE4zo <br /> 4�C� G'/tea <br /> GREGORY P. <br /> STAHL <br /> Gregory P Stahl,RG 5023 No 5023 <br /> CA Certified Hydrogeologist 264 <br /> Attachments �lq�F OF CA�1Fa��\P <br /> cc Mr Patrick Riddle <br /> Mr Gary Gabbard <br />. Mr Mark List, RWQCB <br /> groundzelgabbardladd_bonng_rpt doc <br />