Laserfiche WebLink
PARK STREET <br /> DRIVEWAY <br /> MW-6/SB-1A <br /> bM -7/SB-11 <br /> 7 BU1LpING P-SG4 <br /> P-SGip l <br /> ,p MW-1 <br /> MW-27 <br /> -SG3 <br /> or <br /> w <br /> m <br /> MW-�— <br /> P_j�P-HP08 <br /> P-S �J <br /> O 7MW--4 <br /> JI A <br /> r <br /> m W-SG5 <br /> MW5/SB-9t <br /> BU1 � DING <br /> a <br /> W <br /> J <br /> H , LEGEND <br /> FORMER UST <br /> MW-4p MONITORING WELL <br /> 0 20 40 80 120 7' PROPOSED SOIL GAS SURVEY POINT <br /> -0 PROPOSED HYDRO PUNCH SAMPLE LOCATION m=mmmIIIIIl <br /> (ANGLE BORING) <br /> SCALE IN FEET <br /> BASE MAP FROM MORROW SURVEYING, JANUARY 2002 <br /> PROPOSED GROUNDWATER AND SOIL GAS FIGURE <br /> GROUND ZERO ANALYSIS SURVEY SAMPLE POINTS <br /> GENE GABBARD INC. 3 <br /> 640 NORTH EL DORADO STREET <br /> STOCKTON, CA <br /> FN, 0308/25653 <br />