Laserfiche WebLink
CERS Consolidated Emergency Response/Contingency Plan—Page S of 5 Rev.0627/11 <br /> H. EARTHQUAKE VULNERABILITY <br /> Identify areas of the facility that are vulnerable to hazardous materials releases/spills due to earthquake-related motion.These areas require immediate isolation and <br /> inspection. <br /> VULNERABLE AREAS:(Check all that apply) H1 LOCATIONS(e.g.,shop,outdoor shed,forensic lab) _ <br /> &-I.HAZARDOUS MATERIALS/WASTE STORAGE AREA HZ <br /> ❑ 2.PROCESS LINES/PIPING H3. <br /> ❑ 3.LABORATORY r <br /> H4. <br /> ❑ 4.WASTE TREATMENT AREA Hs <br /> Identify mechanicals stems vulnerable to releases/spills due to earthquake-related motion.These systems require immediate isolation and inspection. <br /> VULNERABLE SYSTEMS:(Check all that apply) H6. LOCATIONS <br /> ❑ 1.SHELVES,CABINETS AND RACKS - ---- - ---- --Hi <br /> ❑ 2.TANKS(EMERGENCY SHUTOFF) HS. <br /> ❑ 3.PORTABLE GAS CYLINDERS F 17-19. <br /> ❑ 4.EMERGENCY SHUTOFF AND/OR UTILITY VALVES Hto. <br /> ❑ 5.SPRINKLER SYSTEMS H11 <br /> ❑ 6.STATIONARY PRESSURIZED CONTAINERS(e.g.,Propane dispensing tank) Hie. <br /> I. EMPLOYEE TIWNING <br /> Explanation of Requirement:Employee training is required for all employees handling ha ardous materials and hazardous wastes in day-to-day or clean-up operations <br /> including volunteers and/or contractors."training must be: <br /> • Provided within 6 months for new hires; <br /> • Amended as necessary prior to change in process or work assignment-, <br /> • Given upon modification to the Emergency Response/Contingency Plan,and updated/refreshed annually for all employees. <br /> Required content includes all of the following: <br /> • Material Safety Data Sheets: • Communication and alarm systems; <br /> • Hazard communication related to health and safety-, • Personal protective equipment; <br /> • Methods for safe handling of hazardous substances; • Use of emergency response equipment(e.g.Fire extinguishers,respirators, <br /> • Fire hazards of materials/processes; etc.): <br /> • Conditions likely to worsen emergencies; • Decontamination procedures, <br /> • Coordination of emergency response; • Evacuation procedures; <br /> • Notification procedures; • Co itrol and containment procedures; <br /> • Applicable laws and regulations; • US"1'monitoring system equipment and procedures(if applicable). <br /> INDICATE HOW EMPLOYEE TRAINING PROGRAM IS ADMINISTERED(Check all that apply) <br /> Ell. FORMAL CLASSROOM; 0 2. VIDEOS; ❑3. SAFETY/TAILGATE MEETINGS; <br /> ❑4. STUDY GUIDES/MANUALS(Specify): 12. <br /> ❑5. OTHER(Specify): 13 <br /> ❑6. NOT APPLICABLE BECAUSE FACILITY I IAS NO EMPLOYEES <br /> Large Quantity Generator(LQG)Training Records: Large quantity hazardous waste generators (i.e., who generate more than 270 gallons/1,000 kilograms of <br /> hazardous waste per month)must retain written documentation of employee hazardous waste management training sessions which includes: <br /> • A written outline/agenda of the type and amount of both introductory and continuing training that will be given to persons filling each job position having <br /> responsibility for the management of hazardous waste(e.g.,labeling manifesting,compliance with accumulation time limits,etc.). <br /> • The name,job title,and date of training for each hazardous waste management training session given to an employee filling such a job position,and <br /> • A written job description for each of the above job positions that describes job duties and the skills,education,or other qualifications required of personnel assigned <br /> to the position. <br /> • Current employee training records must be retained until closure of the facility. <br /> • Former employee training records must be retained at least three years after termination of employment. <br /> J. LIST OF ATTACHMENTS <br /> ,,9Check one of the following) 11 <br /> 1. NO ATTACHMENTS ARE REQUIRED;or <br /> ❑2. THE FOLLOWING DOCUMENTS ARE ATTACHED: 12 <br /> K. SIGNATURE / CERTIFICATION <br /> Certification: Based on my inquiry of those individuals responsible for obtaining the it formation,I certify under penalty of law that I have personally examined and <br /> am familiar with the information submitted and believe the information is true,accurate,znd complete,and that a copy is available on site. <br /> SIGNATURE OF <br /> OF OWNER/OPER R DATE SIGNED K1 <br /> i " 4 1 l C S 1 I <br /> NAME OF SIGNER(print) K2 "ITLE OF SIGNER K3 <br />