My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEISS
>
1512
>
2800 - Aboveground Petroleum Storage Program
>
PR0516194
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2021 4:32:17 PM
Creation date
9/27/2018 4:36:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0516194
PE
2832
FACILITY_ID
FA0009167
FACILITY_NAME
VALLEY PACIFIC PETROLEUM ESCALON
STREET_NUMBER
1512
STREET_NAME
WEISS
STREET_TYPE
WAY
City
ESCALON
Zip
95320
APN
22708001
CURRENT_STATUS
01
SITE_LOCATION
1512 WEISS WAY
P_LOCATION
06
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San Joaquin County <br /> Environmental Health Department <br /> 1868 East Hazelton Avenue, Stockton, California95205-6232 <br /> Telephone: (209) 468-3420 Fax: (209) 468-3433 Web:WWW.Slqov.org/etid <br /> Aboveground Petroleum Storage Act Inspection Report <br /> Date: <br /> Facility: Facility Address: hrua 01. 2016 <br /> Valle Pacific Petroleum Escalon <br /> General Requirements for SPCC Plans <br /> ❑V ❑R ❑COS <br /> 615 CFR 112.7(1)(2) Failed to designate a person accountable for discharge prevention <br /> ❑V o ❑COS <br /> 616 CFR 112.7(0(3) Failed to schedule and conduct discharge prevention briefings at least annually <br /> ❑V ❑R ❑COS <br /> 617 CFR 112.7(g) Plan failed to address security of site and valves,lock out/tag out,and lighting <br /> 618 CFR 112.7(h)(1) Loading/unloading rack containment system not properly sized <br /> w ❑R ❑COS <br /> ■V ❑R ❑COS <br /> 619 CFR 112.7(h)(2) Failed to provide vehicular departure system loading and unloading racks m V ❑ R ❑COS <br /> 620 CFR 112.7(h)(3) Failed to inspect lowermost drains and outlets prior to filling and departure of vehicles <br /> 521 GFR 112.7(1) Failed to evaluate field constructed container for brittle fracture and take appropriate action ❑V ❑R ❑COS <br /> 622 CFR 112.70) Failed to include discussion of conformance to discharge prevention and containment procedures ❑V ❑R ❑COS <br /> SPCC Plan Requirements for Onshore Facilities (excluding production facilities) <br /> o o ❑COS <br /> 701 CFR 112.8(b)(2) Failed to use manual open-and-closed design valves for the drainage of diked areas <br /> 702 CFR 112.8(b)(3), Failed to design facility drainage system from undiked areas to retain in the facility <br /> D o ❑COS <br /> 112.8(b)(4) ❑V ❑R ❑COS <br /> 703 CFR 112.8(b)(5) Failed to provide two lift pumps for more than one continuous treatment unit <br /> 704 CFR 112.8(c)(2) Diked area is not sufficiently imperyious to contain discharged oil ❑V ❑R ❑COS <br /> ontamer not compatible with on stored and/or storage conditions ❑V 11 R ❑COS <br /> TM CFR 112.tttc)(1) P <br /> Failed to provide and maintain adequate seconds containment ❑V ❑R ❑COS <br /> 706 CFR 112.8(c)(2) p q secondary <br /> 707 CFR 112.8(c)(3)(i) Failed to keep containment bypass valves closed when not draining rainwater o o ❑COS <br /> Ir prior to discharge <br /> 708 CFR 112.8(c)(3)(11) Failed to inspect retained rainwate <br /> ❑V ❑R ❑COS <br /> 709 CFR 112.8(c)(3)(iii) Failed to open and close bypass valve to drain rainwater under responsible supervision ❑V ❑R ❑COS <br /> 710 CFR 112.8(c)(3)(iv) Failed to maintain records of drainage from diked areas <br /> ❑V ❑R ❑COS <br /> ❑V 0 ❑COS <br /> 711 CFR 112.8(c)(5) Failed to provide corrosion protection for partially buried tanks <br /> 712 CFR 112.8(c)(6) Failed to perform tank inspections that take into account size,configuration,and design ■V ❑R ❑COS <br /> nspections by appropriately qualified personnel ❑V ❑R ❑COS <br /> 713 CFR 112.8(c)(6) Failed to perform scheduled tank tests and i <br /> 714 CFR 112.8(c)(6) Failed to test and inspect containers by appropriately qualified personnel after material repairs ❑V [IR ❑COS <br /> o D ❑COS <br /> 715 CFR 112.8(c)(7) Failed to provide effective leakage control through defective internal heating coils <br /> tainer with a high level monitoring device <br /> 716 CFR 112.8(c)(8)(i-iv) Failed to provide each con <br /> ■V ❑R ❑COS <br /> 717 CFR 112.8(c)(8)(v) Failed to regularly test liquid level sensing devices to ensure proper operation <br /> ■V ❑R ❑COS <br /> 718 CFR 112.8(c)(9) Failed to observe effluent treatment frequently enough to detect potential discharge <br /> ❑V ❑R COS <br /> ❑ <br /> 719 CFR 112.8(c)(10) Failed to promptly correct visible discharges and/or remove accumulations of oil in diked areas ❑V ❑R ❑COS <br /> 720 GFR 112.8(c)(11) Failed to provide sufficient secondary containment capacity for mobile or portable containers <br /> ❑V D ❑COS <br /> 721 CFR 112.8(c)(11) Failed to locate mobile or portable containers to prevent discharge <br /> ❑V D ❑COS <br /> 722 CFR 112.8(d)(1) Failed to take corrective action on buried piping when exposed for any reason <br /> D E ❑COS <br /> 723 CFR 112.8(d)(1) Failed to provide corrosion protection for buried piping <br /> o ❑R ❑COS <br /> 724 CFR 112.8(d)(2) Failed to cap/blank-flange connection at transfer point and mark its origin if not in service ❑V ❑R ❑COS <br /> 725 CFR 112.8(d)(3) Failed to design pipe supports to minimize abrasion/corrosion and to allow for expansion/contraction ❑V ❑R ❑COS <br /> e� Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.