My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998 -2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRESNO
>
1524
>
2300 - Underground Storage Tank Program
>
PR0506545
>
COMPLIANCE INFO_1998 -2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2023 9:38:21 AM
Creation date
9/28/2018 11:22:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO_1998 -2011
FileName_PostFix
1998 -2011
RECORD_ID
PR0506545
PE
2361
FACILITY_ID
FA0007491
FACILITY_NAME
VALLEY PACIFIC FRESNO AVE CARDLOCK
STREET_NUMBER
1524
STREET_NAME
FRESNO
STREET_TYPE
AVE
City
STOCKTON
Zip
95206
APN
16337025
CURRENT_STATUS
01
SITE_LOCATION
1524 FRESNO AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
269
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. In -Tank Gauging / SIR Equipment: ❑ Check this box if tank gauging is used only for inventory control. <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Comnlete the following checklist: <br />es <br />❑ No* <br />Has all input wiring been inspected for proper entry and termination, including -testing-for—ground faults? <br />,5:37es <br />❑ No* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />;Yes <br />❑ No* <br />Was accuracy of system product level readings tested? <br />es <br />❑ No* <br />Was accuracy of system water level readings tested? <br />es <br />❑ No* <br />Were all probes reinstal1ed'pr6perly? <br />Yes <br />I ❑ No* I <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />- to the Section it, beiow, aescrine now ana wnen tnese aenciencies were or will be corrected. <br />G. Line Leak Detectors (LLD): <br />Comnlete the fnllnwinsr eheeklist- <br />❑ Check this box if LLDs are not installed. <br />es <br />❑ No* <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br />❑ N/A <br />(Check all that apply) Simulated leak rate: bllrg.p.h.; ❑ 0.1 g.p.h ; ❑ 0.2 g.p.h. <br />C3No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />Ves <br />❑ No* <br />Was the testing apparatus properly calibrated? <br />❑ No* <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />❑ N/A <br />❑ Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />❑ N/A <br />❑ Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />❑ N/A <br />or disconnected? <br />❑ Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br />❑ N/A <br />malfunctions or fails a test?. <br />❑ Yes <br />❑ No* <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />_ <br />❑ N/A <br />Yes <br />❑ No* I <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />- to we aecuuu n, ueiow, aescnoe now ana wnen these oeliciencies were or will be corrected. <br />H. Comments: <br />Testing Company Name: TANK-TEK ENVIRONMENTAL <br />ONMENTAL CORPORATION <br />Site Address: 1524 ��N0 A -AV <br />Phone No.: (707) 446-6151 <br />Date of Testing/Servicing: ZL <br />Page 3 of 3 03/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.