Laserfiche WebLink
Apr -.28-03 03:03P Wool, y Oil, Inc- <br />F. <br />nc. <br />F. In -Tank Gauging /:SIR Equipment: <br />209 —18 0755 P.03 <br />❑ Check this box if tank gauging is used only for inventory control. <br />0 Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />f mmr4tn tbn f finwriw rheekl st: <br />CrYes <br />❑ No* <br />..mom <br />Hag all input wiring been inspected for pwper entry and termination, including testing for ground faults? <br />0 -Yes <br />❑ No* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />Yes <br />❑ No* <br />Was accuracy of system product level readings to ftV <br />Or Yes <br />❑ No* <br />Was accmracy of system water keel readings tested? <br />Yes <br />❑ Not <br />Were all probes rehistalled propetiy? <br />Er Yes <br />I O No* <br />Were all items on the equipment manufsdurcr's maintenance clie ddist eomplebcd? <br />* In the Section H, below, desenDe now ane weeit ruese uencencies were or win oc corrmtcu. <br />G. Line Leak Detectors (LLD): 0 Check this box if LLDs are not installed. <br />0 -Yea <br />❑ No* <br />For cgtiipnwd start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br />❑ N/A <br />(['heck alf that apply) Simnlmed leak rate: ❑ 3 g.p.h.; 130.1 g.p h ; O 0.2 g.p.h. <br />8 Yes <br />0 No* <br />Were all LLDs confirmed operational and accurate within regulatory requireme ? <br />D -Yes <br />❑ No* <br />Was the testing apparatus properly callbrated? <br />Yes <br />❑ Not <br />For nnerbanical LLDs, does the LLD restrict WwkKt flow if it detects a leak? <br />❑ N/A <br />❑ Yes <br />[El <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />0'N/A <br />Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />3- WA <br />or dismanected? <br />O Yes <br />❑ No* <br />For eloctronic LLDs, does the turbine automatically shut off if any porfm of the monitoring system malfunctions <br />G' N/A <br />or fails a test? <br />Yes <br />❑ No <br />For electrorm LLDs, have all accessible wiring connections been visually inspected? <br />I❑ <br />6 N/A <br />EJ Yes <br />❑ No* <br />Wcre all items on the equipment manu5loturer's maintenance checklist compkted? <br />* In the Section H, below, describe how and when these deficiencies were or will De corrected. <br />H. Comments: <br />Page 3 of 3 03/01 <br />