Laserfiche WebLink
FROM : OIL EQUIPMENT PHONE NO. : 209 7545726 Jan. 16 2003 04:50AM P4 <br />SWRCB, January 2002 <br />Test Method Developed By <br />Test Method Used: <br />Test Equipment Used: <br />Piping Material: <br />Piping Manufacturer: <br />Piping Diameter: <br />Length of Piping Run: <br />Product Stored: <br />Mcthod and location of <br />pipin -run isolation: <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />Test Start Time: <br />Initial Rcadins (Rj): <br />Test End Time: <br />Final Reading (Rh): <br />Test Duration: <br />Change in Reading (R,�R,). <br />Paco/Rml Threshold or <br />5. SECONDARY PIPE TEST11Vtir <br />U piping Manufacturer U industry Standard <br />U Other (Specify) <br />U Pressure IJ Vacuwn <br />U Other (Specify) <br />Equip. <br />Run # Piping Run # Pipin <br />Fuge of 8 <br />U Professional Engineer <br />1.1 Hydrostatic <br />ent Resolution: <br />Run # Piping Run* <br />k.ntcrna: U Pass U Fall <br />Test Result: I..I Pass u Fail U Pass U Fail U Pass U Kati <br />Comments — (include information on re airs mode PHot ra tastin and reeontrnended nWow- or jailed tests) <br />