Laserfiche WebLink
Monitoring System Certification <br /> UST Monitoring Site Plan <br /> • Site Address: 1624 FRESNO AVENUE, STOCKTON,CA 95206 <br /> . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . 4 <br /> . . . . . . . . . . . . . . . . <br /> 3 . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . <br /> 2A . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> 1A . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . 111 . 1 . 11 . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . <br /> . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> VAPOR & ANNULARAOMONITOR- -Z PIPING <br /> FILL (D TURBINE (D VENT 0ATG <br /> Date map was drawn: 06/ 30/ 10 <br /> Instructions <br /> If you already have a diagram that shows all required information,you may include it,rather than this page,with your Monitoring System Certification. On <br /> your site plan,show the general layout of tanks and piping. Clearly identify locations of the following equipment, if installed: monitoring system control <br /> panels;sensors monitoring tank annular spaces,sumps,dispenser pans,spill containers,or other secondary containment areas;mechanical or electronic line <br /> leak detectors;and in-tank liquid level probes(if used for leak detection). In the space provided,note the date this Site Plan was prepared. <br /> Monitoring System Certification 12/07 <br /> 2/21/07 <br />