Laserfiche WebLink
MONITORING AND REPORTING PROGRAM ORDER NO. R5-2015-0012-007 3 <br /> APACHE PLASTICS (Former) <br /> 2050 EAST FREMONT STREET, STOCKTON <br /> SAN JOAQUIN COUNTY <br /> FIELD SAMPLING <br /> 3 . In addition to the above sampling and analysis , field sampling and analysis shall be conducted <br /> each time a monitoring well or injection well is sampled . The sampling and analysis of field <br /> parameters shall be as specified in Table 3 . <br /> Table 3 : Field Samplin Requirements <br /> Parameters Units Practical Analytical Method <br /> Quantitation Limit <br /> Groundwater Elevation Feet, Mean Sea Level 0 . 01 feet Measurement +/- <br /> 0 . 01 ft. <br /> Oxidation-Reduction Millivolts 10 millivolts Field Meter <br /> Potential <br /> Electrical Conductivity uhmos/cm 50 PS/CM2Field Meter <br /> Dissolved Oxygen mg/L 0 . 2 mg/L Field Meter <br /> pH pH Units (to 0 . 1 units) 0 . 1 units Field Meter <br /> Temperature °F/°C 0 . 1 °F/°C Field Meter <br /> All wells that are purged shall be purged until pH , temperature , conductivity and dissolved <br /> oxygen are within 10% of the previous value. <br /> 4 . Field test instruments (such as those used to test pH and dissolved oxygen) may be used <br /> provided that: <br /> (a) The operator is trained in proper use and maintenance of the instruments; <br /> (b) The instruments are calibrated prior to each monitoring event; <br /> (c) Instruments are serviced and/or calibrated by the manufacturer at the recommended <br /> frequency; and <br /> (d) Field calibration reports are submitted as described in item (b) of the 'Reporting" section of this <br /> MRP . <br /> IN -SITU DISCHARGE MONITORING <br /> 5 . The Discharger shall monitor during the injection event the discharge of hydrogen peroxide that <br /> is injected into the groundwater according to the requirements specified in Table 4 . Each <br /> amendment addition shall be recorded individually, along with information regarding the time <br /> period over which the amendment was injected into the subsurface . <br /> Table 4: Discharge Monitoring Requirements <br /> Parameters Units T pe of Sam le <br /> Injected Volume gallons of injectant per day Meter <br /> i <br />