My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2050
>
3500 - Local Oversight Program
>
PR0543791
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2018 2:25:50 AM
Creation date
9/28/2018 11:45:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0543791
PE
3526
FACILITY_ID
FA0003592
FACILITY_NAME
Aries Tek, LLC
STREET_NUMBER
2050
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
St
City
Stockton
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
2050 E Fremont St
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
313
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> Page 1 of 1 <br /> Lori Duncan [EH] <br /> From : Lori Duncan [EH] <br /> Sent: Wednesday, September 17, 2008 8 :27 AM <br /> To: 'dvilIan ueva@advgeoenv.com' <br /> Subject: RE : Extension Request-Apache Plastics <br /> i <br /> Daniel , <br /> Thank you . New due date for the report is October 7, 2008, <br /> Lori Duncan , Senior REHS <br /> San Joaquin County <br /> Environmental Health Department <br /> Iduncan@.sjcehd ,com <br /> (209) 468-0337 phone <br /> (209) 468-3433 fax <br /> From : Daniel Villanueva [mailto:dvillanueva@advgeoenv.com] <br /> Sent: Tuesday, September 16, 2008 3 : 29 PM <br /> To: Lori Duncan [EH] <br /> Subject: Extension Request-Apache Plastics <br /> Lori , <br /> In a letter received by Advanced GeoEnvironmental on 19 August 2008 you requested that a <br /> report documenting the monitoring well installation , aquifer pump, and ozone infusion bench <br /> scale test be submitted on our clients behalf by 4 September 2008. A report summarizing the <br /> installation of the monitoring wells (MW- 19, MW-20, and EWA , ) and soil boring B-10 was <br /> submitted to you on 04 September 2008. The boring logs and report were then rejected and <br /> AGE, in response to the denials, corrected , and re-uploaded the report and its enclosures to the <br /> geotracker database. An additional report documenting the field work and laboratory analytical <br /> data for the aquifer pump and ozone infusion bench scale test has been completed and is in the <br /> process of being submitted pending a meeting with the responsible party upon his arrival and <br /> return from out of state. At this time AGE requests an extension of 21 days to submit the report <br /> of findings for the aquifer pump, and ozone infusion bench scale test. <br /> Daniel Villanueva <br /> Staff Geologist <br /> Advanced GeoEnvironmental, Inc. <br /> Stockton • Santa Rosa • Monterev • Brea <br /> 1 -800-511 -9300 <br /> dvillan ueva(aiadvgeoenv. coin <br /> www .advgeoenv.com. <br /> This email message is for the sole use of the intended recipient(s) and may contain eoafrden tial and privileged <br /> information. Any mwuthorized review, use. disclosure of distribution of this ernaiPfax is prohibited. If you are not the <br /> intended recipient, please contact the sender by email/fax and destroy all paper and electronic copies of the original <br /> message. <br /> 9/ 17/2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.