Laserfiche WebLink
03-11-97 11: 17AM FROM VITO TRANS-MODESTO P00 <br /> 3 <br /> UST SYSTEM/DRAWING INFORMATION <br /> 1. ✓ Three campLete sets of plans (imetude manufacturer's specification sheets for proposed equipment to be instatled). <br /> 2. f Plans drawn to scale in nal-erasable print. <br /> 3, ✓r Ptat plan to show location of tanks and all associated piping. <br /> 4. ✓ gtrikor ptatea or drop tube-smelted bctton protectors illustrated below all accessible openings. <br /> S. ✓ Tank cross-sectional diagram, <br /> 6. ✓ GetaiL of tank, aas*cisted piping, excavation and cover. <br /> 7. Tanks) and piping approved by a nationally recognized independent testing organisation. [Titte 23, Chapter 16, <br /> —/ article 3, section 2631 (bl S 26353 <br /> a. ✓ Verification of product copapatibi0 ty with the tank(s), piping, monitoring <br /> device(s), epoxy or eilitone Stuas, etc. <br /> 9. Manufacturer's written installatien instructions for tank(al, piping, monitoring devices, etc. <br /> 10, At the installation site, prior to installation, a tightness test shaLl be performed on both primary (1') and <br /> secondary (2°) containment systems before covering. tSaction 2635 (a) (3) 3 (431 <br /> 11. '� Tank integrity teat required upon cwapletion of inatailation with tank in Operating condition. Test results to be <br /> submitted directly to PNS-ENO frac the testing caVany or owner of foritity. ;Health i safety Code, Division 20, <br /> Chapter 6.7, Section 25291 (h)I <br /> 12. TANK tOWMITION <br /> TANK N if I 0 q it g <br /> CAPACITY <br /> MANUFACTURER <br /> CONOCSITION <br /> MODEL <br /> PRODUCT b <br /> GQRROSIOM PROTECTION Ye <br /> U.L. LISTED <br /> COMPATIBILITY WITH 100% <br /> M£THARUL <br /> 13, TANK(s) To 09 109TAL UM <br /> A. Stas(-*tad with fiberglass reinforced plastie ecatinlis, composite*, or equivalent non-metallic exterior <br /> coatings or covering$. <br /> _ (1) Tested at the instailation site using an electric resistam s holiday detector. <br /> (2) Yeotaae applied t4 interstitial Specs. <br /> B. Fiberetess <br /> (1) instsila3tion instructiane require an air test and soap bubble test prior to installation. <br /> _ C21 Vacuum appLied to Interstitial space. <br /> (3) Hydrostatic annular (primary tank pressure test). <br /> _ C. Mon-clad stoat tank tsection 2635 (a) (2) (A)] <br /> _ (1) Cathodic protection pt*Vidad for entire tank, piping and components (nuts, bolts, Washers <br /> etc.). <br /> (2) Field installed cathodic protection systems designed and certified as adequate boy a <br /> `^ corrosion specialist. <br /> C3) impressed current eystems to be inspected ria less then every 60 days, <br />