Laserfiche WebLink
04-10-97 11 : 14p"1I FROM V17)"1° TRANS-MODESTO <br /> PLE7PMET SERVICE <br /> f_1�t � <br /> TO: WK RENIUO 97 SPR t I phi 9: 58 <br /> FROM; Doug Wilson, Supervising R.E.H.S. <br /> DATE: April 10, 1997 <br /> RE: 1789 FRESNO AVE LIST OF ITEMS TO BE PROVIDED PRIOR TO APPROVAL OF PLANS <br /> THE FOLLOWING MUST BE PROVIDED; <br /> I. LACK OF ENGINEER STAMP AND SIGNATURE FOR TANK FLOAT CALCULATION <br /> NEEDS KIND AND MODEL NUMBER OF FX1 <br /> NEEDS THE LOCATION OF GILBARCO EMC ON PLAN <br /> kk 4. NEEDS THE EMC MODEL NUMBER ETC. <br /> u (A 5. NEEDS TO SHOW STRIKER. PLATE AT THE TANK OPENINGS OR ADD STATEMENT <br /> You 0-kVG7 6. PAGE 8 OF APPLICATION MUST BE FILLED OUT <br /> 7. NEEDS TO SHOW IF THE MONITORING SYSTEM IS ON&MOTHER PROPERTY--- THIS COULD NOT <br /> BE PERMITTED. <br /> �� rtVE 8. NEEDS A DIAGRAM OF PRODUCT LINES AT THE TANK SUMP. NONE SHOWN <br /> WA cf Vq <br />