Laserfiche WebLink
SAN JOAQUIN COUNTY ENVIRONMENTAL HEALTH DEPARTMENT <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-PAGE 1 <br /> TYPE OF ACTION 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION htot' <br /> PLAN I'YPP. MONITORING IS IDENTICAL FOR ALL USTs ATTHIS FACILITY. A13= <br /> Check one item only) ❑ THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> I. FACILITY INFORMATION <br /> FACILITY ID d(Agency Use Only) <br /> FACILITY NAME Country Market Cardtock h+O' <br /> FACILITY SITE ADDRESS 1524 Fresno Ave M6S CITY Stockton Mos. <br /> 1I. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Slate 1"V requires that testing.preventive maintenance,and calibration of monitoring equipment(e.g,sensors,probes,line leek detectors,etc.)be performed in 1,106. <br /> accordance With the equipment manufacturers'instructions,or annuall, ,whichever is more frequent. Such work must be performed by qualified personnel. <br /> MONITORING EQUIPMENT IS SERVICED I.ANNUALLYhu'7 <br /> ❑ 99.OTHER(Specify): <br /> III. MONITORING LOCATIONS <br /> This monitoring plan must include a Site Plan slwwing the general tank attd piping layouts and the lorati0as Where monitoring is performed(Le.,local ion ofeach scasor. <br /> OCI line leak detector,monitoring system control panel,etc.). If you already have a diagram(c-g.,current UST Monitoring Site Plan from a Monitoring System Certification <br /> co form,HazArdaus Materials Business Plan map,etc.)which shows all required information,include it with this plan. <br /> IV. TANK MONITORING <br /> N MONITORING IS PERFORMED USING THE FOLLOWING A4ETHOD(S):(Check all that apply) MO <br /> cMn 1.CONThIUOUS ELECTRONIC MONITORING F TANK ANNULAR(INTERSTITIAL)SPACES)OR SECONDARY CONTAINMENT VAULT(S) <br /> o SECONDARY CON'T'AINMENT IS: a.DRY ❑ b.LIQUID FILLED ❑ c.UNDER PRESSURE ❑ d.UNDER VACUUM <br /> z <br /> \ PANEL MANUFACTURER: Gilbamo h1L2 MODEL4: 0346014-100 h+t3 <br /> LEAK SENSOR MANUFACTURER: Gilbarco h1t4 MODEL k(S): P A 0 2 5 5 1 14 4 0 0 0 ti+ts <br /> M ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USEDTO MONITOR SINGLE WALL TANKf5) <br /> N <br /> PANEL MANUFACTURER: but MODEL 4: t+17 <br /> IN-I ANK PROBE MANUFACTURER: hits MODEL 9(S): '+Is <br /> LEAK TrS'r FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILYIN[GHTLY ❑ c.WEEKLY a:c <br /> M <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): N21 <br /> N PROGRANIMEDTESTS: <br /> 81_0.1 g.p.h. ❑ b.0.2g.p.h, ❑ c.OTHER(Specify): <br /> o ❑ 3.INVENTORY RECONCILIATION ❑ a_MANUAL PER 23 CCR§2646 ❑ b.STATISTICAL PER 23 OCR§2646.1 W4 <br /> N ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)PER 23 CCR§2645 <br /> TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS nes. <br /> ❑ 5 INTEGRITY TEST]NG PER 23 CCR§2643,1 <br /> z TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify); ht26 N77 <br /> _ ❑ 6.L'ISUAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY(aaquirnrym,-yipprod} <br /> o ❑ 99.OFFIER(Specifvl: hies <br /> w <br /> V. PIPE MONITORING <br /> Vii(NITORING 1S PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) "13d <br /> l.CONTINUOUS ELECTRONIC MONITORIN,_G,/OF PIPING SUMP(S)TRENCH(ES)AND OTHER SECONDARY CONTAINMENT <br /> SECONDARY CONLyTAINMENT]S: a.DRY ❑ b.LIQUID FILLED ❑ c.UNDER PRESSURE ❑C/id.UNDER VACUUM ht3t <br /> PANEL MANUFACTURER: G c I b,_r�o E l,(,( C_ MODEL 4: Sit. A133 <br /> LEAK SENSOR MANUFACTURER: r 11' ..-Co M34 MODEL#(S); 7--os, M113` <br /> WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN? 14 a.YES ❑ h.NO ht3E <br /> WILL FAILUREID[SCoN VECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? fiaja.YES ❑ h_NO Mai <br /> 2.S4ECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED <br /> �SLI.DMANUFACTt1RER(s}:_ao*-!sake!- Vµ4 h+re. MODELA(S): 9? LQ — Zoea .3, <br /> ❑ 3.17.ECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0it.p.h.LEAK TESTS <br /> EL 1.D MA14 U FACTU RE R: hf40. MODELIp': b1i1 <br /> PROGRAMMED LINE INTEGRITY TESTS: <br /> ❑ a.MINlhlUh!MONTHLY 0.2 g.p.h. ❑ b.\41N[4tUM ANNUAL 0.1 g.p.h. <br /> WILL ELLD DETECTION OF.A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO x'47 <br /> WILL ELLD FAILUREID[SCONNECTIONTRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a-YES ❑ b.NO '114 <br /> ❑ 4.INTEGRITYTESTING <br /> TEST FREQUENCY: ❑ a ANNUALLY ❑ b.EVERY 3 YEARSNos 'A46b <br /> ❑ 5.VISUAL MONITORING DONE: ❑ a DAILY c.OTHER(Specify) <br /> ❑ .WEEKLY6 c.MIN.MONTFQ.Y&EACH TIME SYSTEM()E'ERATED'« <br /> M41'Regi,-ap—y apprc,.yl "Allo»dfa mmiu.ioa of unbuied emerVncy BMeraw fA piping*,dy per HSC 125281.5(b)(3) <br /> ❑ 6-PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 13 CCR§2636(ax3) <br /> ❑ 7.NO PRODUCT OR REMOTE FILL PIPING IS CONN ECTEDTO THE UST(s) <br /> ❑ 99.OTHER(Specifv) h+4s. <br /> O <br /> SJ('VIIIDA(07!03)-114 07123I03 <br />