My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012698
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2050
>
3500 - Local Oversight Program
>
PR0543791
>
ARCHIVED REPORTS XR0012698
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2018 4:00:26 AM
Creation date
9/28/2018 4:09:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS XR0012698
FileName_PostFix
XR0012698
RECORD_ID
PR0543791
PE
3526
FACILITY_ID
FA0003592
FACILITY_NAME
Aries Tek, LLC
STREET_NUMBER
2050
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
St
City
Stockton
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
2050 E Fremont St
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
332
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I INTRODUCPION <br /> el <br /> This report presents the results of the subsurface investigation conducted in May and June 1990 by ! <br /> Western Geologic Resources,Inc.(WGR)at the Apache Plastics,Inc.(API)pipe extruding facility <br /> located at 2050 East Fremont Street in Stockton,California. The purpose of this investigation was <br /> 7 to further evaluate the vertical and horizontal extent of fuel hydrocarbons beneath the API facility <br /> and to evaluate if fuel hydrocarbons were migrating off-site in an estimated dowagradient direction. <br /> As requested,the following scope of work was performed: <br /> 1) Drill three soil borings,B-5,B-6 and B-7; <br /> 2) Collect soil samples at approximate 5-foot intervals for lithologic and hydrogeologic <br /> i classification and for possible chemical and/or sieve analysis; <br /> i 3) Complete soil borings,B-5,B-6 and B-7,as 2-inch diameter monitor wo-Us MW-5,MW-6 <br /> { and MW-7,respectively; <br /> �r 4) Analyze selected soil samples for total petroleum hydrocarbons(TPI)as diesel and/or <br /> i total purgeable petroleum hydrocarbons (TPPH) as gasoline, and benzene, toluene, <br /> jethylbenzene and total xylenes(BTEX)by EPA Methods 8015 and 8070,respectively, <br /> r _ V <br /> 5) Develop the new welts,MW-5 through L✓1W-7,and collect liquid samples from all wells, <br /> rg <br /> of MW-1 through MW-7- Analyze the groundwater samples for TPPH, BTEX and <br /> selected halocarbons by EPA Methods 8015,602 and 601,respectively. Characterize any <br /> liquid hydrocarbon samples collected; <br /> { <br /> � U66RiJIAva t <br /> i <br /> x' <br />
The URL can be used to link to this page
Your browser does not support the video tag.