My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012698
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2050
>
3500 - Local Oversight Program
>
PR0543791
>
ARCHIVED REPORTS XR0012698
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2018 4:00:26 AM
Creation date
9/28/2018 4:09:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS XR0012698
FileName_PostFix
XR0012698
RECORD_ID
PR0543791
PE
3526
FACILITY_ID
FA0003592
FACILITY_NAME
Aries Tek, LLC
STREET_NUMBER
2050
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
St
City
Stockton
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
2050 E Fremont St
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
332
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
g f = r <br /> STANDARD OPERATING PROCEDURES <br /> RE.HOLLOW-STEM AUGER MONPCOR WELL TNSTATdA71ON AND DEVELOPMENT <br /> SOP-3 <br /> The boreholes for monitor wells are drilfed using a truck-mounted hollow-stem auger drill rig.The <br /> diameter of the bo,chole will be a minimum of four inches larger than the outside diameter(OD) <br /> of the casing when installing well screen. The hollow-stem auger provides minimal interruption of <br /> drilling while permitting soil sampling at desired intervals. Soil samples are collected by hammering <br /> a conventional split-barrel sampler containing pie-cleaned 2-inch brass sample tubes. Aeolo " t <br /> g t� <br /> from Western Geologic Resources continuously logs each borehole during dri&2r,and constantly <br /> checks drill cuttings for odors. The sampler is rinsed between samples and steam-cleaned with all <br /> other drilling equipment between borings to prevent cross-contamination. <br /> Monitor wells are cased with threaded, factory-perforated and blank Schedule 40 PVC. The <br /> perforated interval consists of slotted casing,generally 0.020-inch wide by 1.5-inch long slot size, <br /> with 42 slots per foot. A PVC cap is fastened to the bottom of the casing with stainless steel <br /> screws;no solvents or cements are used. Centering devices may be fastened to the casing to assure <br /> even distribution of filter material and grout within the borehole annulus. The well casing is <br /> thoroughly washed and steam-cleaned prior to installation. <br /> After setting the casing inside the hollow stem,sand or gravel filter material is poured into the <br /> annular space to fill from the bottom of the boring to l foot above the perforated interval. A 1- <br /> to 2-foot thick bentonite plug is placed above this filter material to prevent grout from infiltrating <br /> hf down into the filter material. Neat cement,containing about 5%bentonite,is then tremied into the <br /> annular space from the top of the bentonite plug to the surface. A lockable PVC cap is placed on <br /> m each wellhead. Traffic-rated Christy boxes are installed around the wellhead for welts in parking <br /> lots and driveways while steel stove pipes are usually.set over wellheads in landscaped areas. <br /> After installation,the wells are thoroughly developed to remove residual drilling materials from the <br /> wellbore,and to improve well performance by removing any fine material in the filter pack that can <br /> pass from the formation into the well. Well development techniques used include pumping,bailing, <br /> surging,swabbing,jetting,flushing,and airlifting. All development water is collected in 55-gallon <br /> drums for temporary storage,and is then disposed of properly depending on analytic results. To <br /> assure that cross-contamination does not occur between wells during drilling and development,all <br /> t development equipment is steam-cleaned. <br /> Y� - <br /> i <br /> u <br />
The URL can be used to link to this page
Your browser does not support the video tag.