Laserfiche WebLink
i <br /> WHSTER .NGE01,()GIC RESOURCES , INC . <br /> tai <br /> STANDARD OPERATING PROCEDURES <br /> RE:HOLLOW-STEM AUGER MONITOR WELL INSTALLATION AND DEVELOPMENT <br /> SOP-3 <br /> The toreholes for monitor wells are drilled using a truck-mounted hollow-stem auger drill rig.The <br /> dkmeter of the borehole will be a minimum of four inches larger than the outside diameter(01)}of the casing <br /> when installing well screen. The hollow-stem auger provides minimal interruption of drilling while permitting <br /> Pf soil sampling at desired intervals. Soil samples are collected by hammering a conventional split-barrel sampler <br /> containing pre cleaned 2-inch brass sample tubes. A geologist from Western Geologic Resources continuously <br /> logs each borehole during drilling and co:astantly checks drill cuttings for odors. The sampler is rinsed between <br /> .a samples and steam-cleaned with all ntLer drilling equipment between borings to prevent cross-contamination. <br /> r Monitor wells are cased with threaded,factory-perforated and blank Schedule 40 PVC. The perforated <br /> : z interval consists of slotted casing,generally 0.020-inch wide by 1.5-inch long slot size,with 42 slots per foot. A <br /> PVC cap is fastened to the bottom of the casing with stainless steel screws;no solvents or cements are used. <br /> Centering devices may be fastened to the casing to assure even distribution of filter material and grout within <br /> the borehole annulus. The,well casing is thoroughly washed and steam-cleaned prior to installation. <br /> After setting the casing inside the hollow stem,sand or gravel filter material is poured into the annular <br /> space to fill from the bottom of tit:boring to 1 foot above the perforated interval. A 1-to 2-foot thick bentonite <br /> - plug is placed above this filter material to prevent gout from in iltratlLg down into the filter material. Neat <br /> cement,containing about 5%beutonite,is then tremied into the annular space from the top of the bentonite plug <br /> to the surface. A lockable PVC cup is placed on each wellhead. Traffic-rated Christy boxes are installed around <br /> the wellhead for wells in parking lots and driveways while steel stove pipes are usually set over wellheads in <br /> landscaped areas. <br /> i <br /> After installation, the wells are thoroughly developed to remove residual drilling materials from the <br /> wellbore,and to improve well performance by removing any fine material in the filter pack that can pass from _ <br /> i U the formation into the well. Well development techniques used include pumping,bailing,surging, swabbing, <br /> i - jetting,flushing,and airlifting. All development water is collected in 55-gallon drums for temporary storage,and <br /> is then disposed of properly depending on anily'tic results. To assure that cross-contamination does not occur <br /> between wells during drilling and development,all development equipment is steam-cleaned. <br /> �pGJ <br /> f <br /> 5`°s <br /> SOP-9;Nw/ori <br />