My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012698
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2050
>
3500 - Local Oversight Program
>
PR0543791
>
ARCHIVED REPORTS XR0012698
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2018 4:00:26 AM
Creation date
9/28/2018 4:09:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS XR0012698
FileName_PostFix
XR0012698
RECORD_ID
PR0543791
PE
3526
FACILITY_ID
FA0003592
FACILITY_NAME
Aries Tek, LLC
STREET_NUMBER
2050
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
St
City
Stockton
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
2050 E Fremont St
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
332
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> I <br /> ec'fic inR12 - 1 i <br /> 4.12 Pilot test duration would be approximately ane week or unttil four carbon <br /> canisters have been exhausted,whichever occurs first. Approximately one week <br /> would be required to set up the pilot test system. If carbon is exhausted within <br /> a few days,data would be evaluated. This pilot test Work Plan would be revised <br /> as necessary,including evaluation of alternative air pollution control technology. <br /> 5.0 Int ct ton a��..extraction Well Installati n <br /> 5.1 Design of a soil treatment cell, extending from site surface to the water table <br /> approximately seventy feet (70') below grade, would be based on results of the <br /> Pilot Test. Figure B-1 presents a schematic diagram of a typical vapor well which <br /> would be in for both extraction and passive air injection. Design of the <br /> well field would be based on the results of the pilot test and evaluation of the <br /> W' lateral and vertical extent of soil contamination. Construction of the well field <br /> could proceed subsequent to the pilot test and concurrently with the assessment <br /> investigation (i.e. from the soil borings drilled for installation of the wells and <br /> manometer points). t <br /> 5,2 i r i n f Vad Z n Air Well <br /> Vadose zone air wells would be installed, if necessary, and constructed to <br /> mirAmize distances between passive injection and extraction points. Minimization <br /> of air travel distance increases control of airflow rates and vacuums and, <br /> consequently, remediation process.control and predictability. <br /> n. To promote air fir)w through the treatment cell, air intake and extraction points <br /> would be stratifed as follows: <br /> Straka 1 15, to 45' <br /> ,w <br /> Strata 2 45' to 75' (approximate depth of water table) <br /> 5.3 YY§ll COWM0119—n <br /> At each air-well location, two eight-inch diameter boreholes would be drilled <br /> ted that one well would be installed to a <br /> adjacent to one another. It is anticipa <br /> depth of approximately 63 feet and the second well to a depth of approximately <br /> 30 feet. For a maximum well depth, the borehole would be advanced from the <br /> soil surface to the lower unit of air release or withdrawn!(at about 65 feet below <br /> grade of the water table capillary fringe). Vadose wells would end above the <br /> e to minimize the yield of free and condensate water <br /> aquifer free water surfac <br /> borehole to its final depth,the borehole <br /> mixed systems. After completion of the <br /> would be partially backfilled with a natural well packing material (sand, pea <br /> _ stone, gravel, etc.) to be selected after site soil evaluation. <br /> The lower vertical air conduit would be placed on the backfill with its upper end <br /> - <br /> approximately two feet above grade(until shortened during air conduits network <br /> ing would be added until the packing reaches <br /> construction). Additional well pack <br /> REM EdiATiON - <br /> B-5 <br /> INC. <br /> SERVICES. <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.