Laserfiche WebLink
TABLE 1 Cont'd Groundwater Elevation Measurements <br /> Project: Apache Plastics, Stockton,CA <br /> Well Casing Depth to <br /> Well ID# Date Measured Elevation Groundwater Elevation <br /> MW-5 12/28/94 1955 6768 -4833 <br /> 2116195 1955 6658 -4703 <br /> 611195 1955 6331 -4376 <br /> 717/95* 1951 6296 -4345 <br /> 917195 1951 6439 4488 <br /> 12/14/95 1951 6245 4294 <br /> 2/20/96 1951 5926 -3975 <br /> 5/23196 1951 5598 -3647 <br /> 8128/96 1951 5863 -39 12 <br /> 1214/96 1951 5673 -3722 <br /> MW-6 12/28/94 1917 Dry <br /> 2/16/95 1917 6618 -4701 <br /> 6/l/95 19 17 6304 -43 87 <br /> 7/7195* 19 13 6268 -4355 <br /> 9/7/95 19 13 Inaccessible <br /> 12/14/95 19 13 62 15 4302 <br /> 2120/96 19 13 5902 -3989 <br /> 5/23/96 19 13 5571 -3658 <br /> 8/28196 19 13 5876 -3963 <br /> 12/4196 19 13 5644 -3731 <br /> • MW-7 12/28/94 1907 6749 -4842 <br /> 2/16/95 1907 6596 4689 <br /> 6/l/95 1907 6265 -4358 <br /> 7/7195* 1905 6240 -4335 <br /> 9/7/95 1905 6388 -4483 <br /> 12/14/95 1905 61 82 -4277 <br /> 2120/96 1905 5869 -3964 <br /> 5123/96 1905 5545 -3640 <br /> 8/28/96 1905 5836 -3931 <br /> 1214/96 1905 5621 -37 16 <br /> * Wells resurveyed 7/7/95 relative to MW-3 <br />