My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0011213
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2050
>
3500 - Local Oversight Program
>
PR0543791
>
ARCHIVED REPORTS XR0011213
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2018 4:06:36 AM
Creation date
9/28/2018 4:22:37 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS XR0011213
FileName_PostFix
XR0011213
RECORD_ID
PR0543791
PE
3526
FACILITY_ID
FA0003592
FACILITY_NAME
Aries Tek, LLC
STREET_NUMBER
2050
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
St
City
Stockton
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
2050 E Fremont St
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Job No R91025 <br /> Soil Remediation Interim Progress Report <br /> Apache Plastics L P <br /> 2050 E Fremont Street <br /> Stockton, California <br /> i10 INTRODUCTION <br /> The Apache Plastics L P facility is located at 2050 E Fremont Street in Stockton, California <br /> (Figure 1, Vicinity Map) This Interim Progress Report describes the results of a pilot test <br /> conducted to assess the applicability of in-situ vapor extraction technology for remediation <br /> of petroleum hydrocarbon contaminated vadose soil at the subject site This report also <br /> ' includes analytical results of soil boring samples obtained during the installation of the pilot <br /> test system The pilot test and soil analyses activities have been conducted in accordance <br /> with Remediation Services, Inc (RS) Draft Remedial Work Plan dated September 24, 1991 <br /> ' 2 0 SITE BACKGROUND <br /> ' Apache Plastics, L P (AP) manufactures extruded plastic pipe at this facility The facility <br /> is located in a mixed commercial district and is bounded on the east by Port Stockton Food <br /> Distributors, Inc, on the west by Kelvard Refrigeration and Appliance Co , on the south by <br /> an auto parts distributor, and on the north, across E Fremont St , by a car wash facility and <br /> Stockton City Taxi Cab Co (Figure 2, Site Map) <br /> ' In August 1988, one 1000-gallon underground gasoline storage tank was removed from the <br /> north side of the AT building Gasoline contamination was detected in the soil beneath the <br /> tank emplacement The project history and investigation results are reported in RS's <br /> September 24, 1991 Draft Remedial Work Plan <br /> ' 3 0 PHASE I ACTIVITIES COMPLETED TO-DATE <br /> Prior to the commencement of the drilling and installation of the vapor extraction well and <br /> ' manometer points, appropriate permits were acquired from the City of Stockton, San <br /> Joaquin Air Pollution Control District and San Joaquin County, Environmental Health <br /> Division <br /> In October 1991, RS installed one vapor extraction well and two manometer points located <br /> approximately as shown on Figure 2 The pilot test blower, piping and air pollution <br /> ' abatement equipment were installed in December On December 17-19, 1991, RS - <br /> conducted a three-day pilot test of the vapor extraction system <br /> 1 <br /> R E M E D I A T I O N <br /> ' SERVICES INC <br />
The URL can be used to link to this page
Your browser does not support the video tag.