Laserfiche WebLink
Based on the above conclusions, RS recommends <br /> 1 <br /> ' O Operation of the pilot system as the full scale vapor extraction system Continuous <br /> operation of the system would achieve a measure of clean-up and provide additional <br /> information upon which to base design changes once soil clean-up levels have been <br /> ' established by the regulatory agency <br /> 0 No air infection wells be installed at this time <br /> ' O Carbon continue to be used for air pollution control Additional beds may need to <br /> be added to facilitate continuous operation of the system <br /> ' O Confirmation soil borings be drilled after six months of operation <br /> ' O Regulatory cleanup levels and time-frame be established after receipt of soil boring <br /> analytical results <br /> 1 <br /> 1 ~ <br /> 5 REM E D I A T ION <br /> ' SERVICES INC <br />