r <br /> July 27,2001 <br /> Project No 2005-2050-01 <br /> page 3 <br /> • Advanced three soil borings to depths of 110 to 115 feet bgs using hollow stem <br /> augers, completing the borings as monitoring wells MW-10 through MW-12, <br /> • Developed and sampled the groundwater monitoring wells, and <br /> • Surveyed the elevations of the 12 monitoring wells, the locations of CPT borings, <br /> and pertinent site features <br /> Prior to initiating field activities, permits to advance the soil borings were obtained from <br /> San Joaquin County PHS/EHD Stratus obtained access agreements to work at 2040 East <br /> Fremont Street, 2050 East Fremont Street, and 2075 East Fremont Street In addition a <br /> revocable encroachment permit was obtained from the City of Stockton Soil borings <br /> were marked and Underground Service Alert (USA) was contacted 48 hours prior to <br /> work activities San Joaquin County PHS/EFID was subsequently notified of the work <br /> schedule <br /> Between February 5 and March 12, 2001 a Stratus geologist observed Gregg Drilling & <br /> Testing, Inc of Martinez, California advance the CPT soil bonngs and drill/install the <br /> groundwater monitoring wells All work was performed under the direction of a <br /> California Registered Geologist The locations of the CPT borings and monitoring wells <br /> are shown on Figure 2 CPT soil borings were advanced to obtain a continuous log of the <br /> subsurface lithology The logs of the CPT bonngs were subsequently used to evaluate <br /> . soil and groundwater sampling intervals The depth of the CPT borings was modified <br /> from the work plan because a soil sample collected at 138 feet bgs at CPT-1 was <br /> impacted with petroleum hydrocarbons The other CPT borings were subsequently <br /> advanced to a minimum depth of 140 feet bgs An additional CPT boring (CPT-10) was <br /> added because the vertical extent of petroleum hydrocarbon impact to soil and <br /> groundwater was not fully assessed at boring CPT-1 Bonng CPT-10 was advanced <br /> southeast (downgradient) of CPT-1 (Figure 2) The location of boring CPT-13 was <br /> modified from the location proposed in the work plan due to the location of underground <br /> utilities <br /> CPT_io LsSfi a1e�.». <br /> CPT TESTING AND DIRECT PUSH SAMPLING ff" ger 4 <br /> The CPT method consists of advancing a cone-tipped cylindrical probe (1 7 inches in <br /> diameter) into the ground while simultaneously measuring the resistance to penetration <br /> The CPT method determines soil lithology by comparing the force (cone bearing <br /> pressure) required to advance the probe (Qt) to the friction ratio (Rf) [(Rf equals sleeve <br /> friction (FS) divided by the probe tip load times the penetration pore pressure (Ud)] A <br /> graphical diagram illustrating CPT interpretations of soil types is included in Appendix <br /> A Computer generated CPT logs were plotted in the field, providing the field <br /> representative a graphical log of subsurface soil lithology The CPT test data report, <br /> which includes logs of all CPT data, graphical geologic logs, and additional information <br /> on the CPT technique is presented in Appendix A CPT tests were performed in <br /> accordance with American Society of Testing and Matenals (ASTM) Method D3441 <br /> C 1Project Files\Apache PlasUcs\Reports\Apache Soil&GW 072001A doc <br />