Laserfiche WebLink
WELL DETAIL <br /> �1 PROJECT NUMBER 22640-100 001 BORING/WELL NO MW-9 (B-1) <br /> PROJECT NAME Apache Plastics GROUND SURFACE ELEV <br /> E m C n LOCATION 2050 E Fremont St Stockton TOP OF CASING ELEV <br /> DRILLER Woodward COORDINATES <br /> WELL PERMIT NO INSTALLATION DATE 2/23-24/99 <br /> Vault box <br /> Top of Casing <br /> EXPLORATORY BORING <br /> 9 a Total depth 105 ft <br /> • b Diameter 8 in <br /> Drilling method __. Hallow Stem Auger <br /> WELL CONSTRUCTION <br /> e h <br /> c Total casing length 105 ft <br /> d <br /> Material Sch 40 PVC <br /> Casing joined by Flush Threads <br /> d Diameter (nominal) 2 in <br /> e Depth to top of perforations 9500 ft <br /> c f Perforated length 892 ft <br /> Perforation interval from 9500 to 103 92 ft <br /> a Perforation type Factory Slot <br /> Perforation size 0 02 in <br /> g Surface seal 1 ft <br /> Surface seal Interval from 0 to 1 ft <br /> Material Cement <br /> h Backfill 89 ft <br /> Backfill interval from 1 to 90 ft <br /> f <br /> Material Grout <br /> I Seal 3 ft <br /> Seal interval from 90 to 93 ft <br /> Material Bentonite Pellets <br /> 1 Filter pack 12 ft <br /> Filter pack interval from 93 to 105 ft <br /> Material _ _ # 3 Lonestar Sand <br /> k Bottom seal NA ft <br /> k Bottom seal interval from NA to NA ft <br /> Material NA <br /> b <br /> Note Drawing not to scale <br /> QA/QC <br /> Logged by Pot Jamison <br /> Checked by/date <br /> GADO FILE, FR N\DwG\0WG\22640100 0a1\Mw-9 DWG <br /> DATE LAST REVISED <br />