Laserfiche WebLink
i <br /> EA—SAMJOSE—CAD/DRAWINGS 1\2611100\6(311 dwq Xrefs <NONE> <br /> Scale 1 = 70 00 DimScale 1 = 70 00 Date 6/2/87 Time 10 08 AM Operator KAJ <br /> 5,000 1 FREMONT STREET <br /> (Mw-1 <br /> N MW-3<50 3a MP-2 SIDEWALK <br /> MP-� CB-1/VW-2 MW-2 <br /> VEW <br /> 500 <50 <br /> MW-7 0 11 000 <br /> <50 <br /> • CB-2 <br /> O <br /> MW-5 <br /> 72 / O <br /> MW-6 <br /> <50 <br /> EXPLANATION <br /> © MONITORING WELL <br /> O VAPOR EXTRACTION WELL <br /> O MANOMETER POINT <br /> • SOIL BORING <br /> 72 TPHG CONCENTRATION O<50 <br /> (parts per billion) <50 <br /> �r TPHG ISOCONCENTRATION (ppb) <br /> 0 70 140 12611-100011 <br /> ATE APR 19FIGURE 11 <br /> WN APACHE PLASTICS <br /> 1EMCOn SCALE ,N FEET PP 2050 FRENIONT STREET <br /> EV STOCKTON, CALIFORNIA <br /> PROJECT NEXTENT OF DISSOLVED <br /> HYDROCARBONS <br />