My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2201
>
2800 - Aboveground Petroleum Storage Program
>
PR0538721
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 2:23:20 PM
Creation date
10/1/2018 3:44:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0538721
PE
2832
FACILITY_ID
FA0009480
FACILITY_NAME
STOCKTON PORT DIST
STREET_NUMBER
2201
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14502004/162030
CURRENT_STATUS
01
SITE_LOCATION
2201 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
EJimenez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STS '001 Monthly Inspection Chc .list <br />Inspection Date: -7 Retain Until Date: (36 months from inspection date) <br />Prior Inspection Date: I Inspector Name: Q`tc-Yc�n (J-JC-(rG <br />Tanks Inspected (ID Ws): AST -1, AST -2 (Administration Building) <br />Inspection Guidance: <br />➢ For equipment not included in this Standard, follow the manufacturer recommended inspection/testing schedules and procedures. <br />Y The periodic AST Inspection is intended for monitoring the external AST condition and its containment structure. This visual inspection <br />does not require a Certified Inspector. It shall be performed by an owner's inspector who is familiar with the site and can identify changes <br />and developing problems. <br />➢ Upon discovery of water in the primary tank, secondary containment area, interstice, or spill container, remove promptly or take other <br />corrective action. Before discharge to the environment, inspect the liquid for regulated products or other contaminants and disposed of it <br />properly. <br />➢ (*) designates an item in a non-conformance status. This indicates that action is required to address a problem. <br />D Non -conforming items important to tank or containment integrity require evaluation by an engineer experienced in AST design, a Certified <br />Inspector, or a tank manufacturer who will determine the corrective action. Note the non-conformance and corresponding corrective <br />action in the comment section. <br />➢ Retain the completed checklists for 36 months. <br />D In the event of severe weather (snow, ice, wind storms) or maintenance (such as painting) that could affect the operation of critical <br />components (normal and emergency vents, valves), an inspection of these components is required as soon as the equipment is safely <br />accessible after the event. <br />Item Task status comments <br />1.0 Tank Containment <br />1.1 Containment structure <br />Check for water, debris, cracks or fire hazard <br />iYes* VIVO DN/A <br />1.2 Primary tank <br />Check for water <br />IYes AO <br />1.3 Containment drain valves <br />Operable and in a closed position <br />Ates -No* :!N/A <br />1.4 Pathways and entry <br />Clear and gates/doors operable <br />Aes -No* -WA <br />2.0 Leak Detection <br />2.1 Tank <br />Visible signs of leakage <br />1=Yes*:No <br />2.2 Secondary Containment <br />Visible signs of leakage from tank into secondary <br />containment <br />...Yes* A0 <br />2.3 Surrounding soil <br />Visible signs of leakage <br />Yes* No ' /A <br />2.4 Interstice <br />Visible signs of leakage <br />-Yes* /No N/A <br />3.0 Tank Equipment <br />3.1 Valves <br />a. Check for leaks. <br />Yes* ANo `N/A <br />b. Tank drain valves must be kept locked. <br />des* _-No A/A <br />3.2 Spill containment boxes on <br />fill pipe <br />a. Inspect for debris, residue, and water in the box <br />and remove. <br />Yes* f No N/A <br />b. Drain valves must be operable and closed. <br />Yes* _iNo /N/A <br />3.3 Liquid level equipment <br />a. Both visual and mechanical devices must be <br />inspected for physical damage. <br />Ofes No* N/A <br />b. Check that the device is easily readable <br />Mes fl:!No* " N/A <br />3.4 Overfill equipment <br />a. If equipped with a "test" button, activate the <br />audible horn or light to confirm operation. This could <br />be battery powered. Replace the battery if needed <br />Yes No* P/A <br />b. If overfill valve is equipped with a mechanical test <br />mechanism, actuate the mechanism to confirm <br />operation. <br />Ves '7No* YJQ�/A <br />3.5 Piping connections <br />Check for leaks, corrosion and damage <br />Yes* )(Vo <br />4.0 Tank Attachments and Appurtenances <br />4.1 Ladder and platform <br />structure <br />Secure with no sign of severe corrosion or damage? <br />® Not Applicable <br />5.0 Other Conditions <br />5.1 Are there other conditions that should be addressed for continued safe operation or <br />that may affect the site spill prevention plan? <br />Yes`rNo <br />
The URL can be used to link to this page
Your browser does not support the video tag.