My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2201
>
2800 - Aboveground Petroleum Storage Program
>
PR0538721
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 2:23:20 PM
Creation date
10/1/2018 3:44:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0538721
PE
2832
FACILITY_ID
FA0009480
FACILITY_NAME
STOCKTON PORT DIST
STREET_NUMBER
2201
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14502004/162030
CURRENT_STATUS
01
SITE_LOCATION
2201 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
EJimenez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Aboveground Petroleum Storage Act Inspection 03/10/16 <br />Item # <br />Summary of Violations <br />301 <br />CFR 112.5(a) Failed to amend Plan as necessary. <br />Condor Earth T <br />-The inventory in the Plan has changed and has not been updated in the Plan. According to the Plan, the site has two <br />hired to updatE <br />100 gallon single walled diesel portable generators. According to Ms. Koehnen, these generators were replaced with <br />The Port will su <br />double walled generators in 2010 or 2012. <br />completion. <br />-The fuel tank at building 719 is no longer on site, but has not been removed from the Plan. <br />The Spill Prevention, Control, and Countermeasure (SPCC) Plan must be amended when there is a change in the <br />facility design, construction, operation, or maintenance that materially affects its potential for a discharge, within 6 <br />months of the change, and implemented as soon as possible, not later than 6 months following preparation of the <br />amendment. Immediately make all necessary amendments to the SPCC Plan to accurately represent the procedures <br />and policies currently in place at the facility. <br />This is a Class II violation <br />302 <br />CFR 112.5(b) Failed to review Plan once every five years and/or implement any resulting amendments. <br />Condor Earth T <br />The Spill Prevention, Control, and Countermeasure (SPCC) Plan was last reviewed on March 15, 2006. The SPCC <br />hired to updatE <br />Plan states "The SPCC Plan must be reviewed and certified by a professional engineer every five years (the next <br />The Port will sL <br />certification is due in February 2011)." A review and evaluation of the SPCC Plan must be conducted at least once <br />completion. <br />every 5 years. As a result of this review and evaluation, the SPCC Plan must be amended within 6 months of review, <br />and recertified by a Professional Engineer if any technical amendments were made. Immediately conduct a review of <br />the facility SPCC Plan and make any necessary amendments. <br />This is a Class II violation. <br />601 <br />CFR 112.7 Plan that does not follow the sequence specified in this section lacks a <br />Condor' T <br />cross-referencing section. <br />hired to updatE <br />The Spill Prevention, Control, and Countermeasure (SPCC) Plan does not follow the order or <br />The Port will SL <br />requirements in 40 CFR Part 112, and the cross-reference was not accurate. If you do not follow the <br />completion. <br />sequence specified in 40 CFR 112 for the Plan, you must prepare an equivalent Plan and supplement <br />it with a section cross-referencing the location of requirements in 40 CFR 112 and the equivalent <br />Plan. Immediately amend the SPCC Plan to include a cross-reference or to follow the required <br />sequence. <br />This is a Class II violation. <br />602 <br />CFR 112.7 Plan lacks approval of management to fully commit the necessary resources to implement the Plan. <br />Condor Earth T <br />The management approval section is unsigned. The Spill Prevention, Control, and Countermeasure (SPCC) Plan must <br />hired to updatE <br />have the full approval of management at a level of authority to commit the necessary resources to fully implement the <br />The Port will SL <br />Plan. The manaeement approval statement was signed at the time of inspection. <br />completion. <br />
The URL can be used to link to this page
Your browser does not support the video tag.