My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
5749
>
2800 - Aboveground Petroleum Storage Program
>
PR0515802
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2019 10:26:15 AM
Creation date
10/2/2018 10:02:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0515802
PE
2832
FACILITY_ID
FA0021241
FACILITY_NAME
TRACY MUNICIPAL AIRPORT
STREET_NUMBER
5749
Direction
S
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
5749 S TRACY BLVD
P_DISTRICT
005
QC Status
Approved
Scanner
EJimenez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f <br />Tankn®1®gy <br />Emergency Stop (E -Stop / ESO) Periodic Inspection <br />Facility information <br />Technician Information <br />Site* Tracy Municipal Airport AIRPORT <br />Date: 8/3/2018 <br />Address: 5749 Tracy Blvd. <br />Name: Jarrod Cooke <br />City / State: Tracy CA�� <br />Technician Signature <br />The objective of this test is to provide assurance that the when the E -Stop switch is activated, all the fueling system circuits (turbines, and <br />dispensers) are de -energized, and remain de -energized until they are reset manually). The test procedures and guidelines shall be in accordance <br />with the E -Stop Testing Process. <br />SITE DATA <br />1 <br />Number of E-Stcp switches INSIDE of the building: <br />0 <br />2 <br />Number of E-Stcp switches OUTSIDE ofthe building: <br />2 <br />PERFORMANCE DATA <br />Yes <br />No <br />NA...; <br />3 <br />You have added or confirmed that all E -Stop locations are on the Site Diagram <br />G <br />4 <br />Do all E -Stops shutdown power to ALL DISPENSERS <br />C <br />is <br />5 <br />Do all E -Stops shutdown power to ALL STP's <br />6 <br />Are ALL E -Stops clearly Labeled <br />7 <br />Are the TURBINE BREAKERS clearly identified / labeled <br />i <br />�' <br />G. <br />POSTTEST <br />8 <br />All equipment secured and any access ports, lids, enclosures are closed. <br />r <br />r <br />9 <br />All safety barricades and test equipment has been properly removed <br />10 <br />E -Stop was reset and all dispensing functions are normal <br />r <br />E -Stop Inspection Results <br />11 <br />PASS I FAIL � INCONCLUSIVE <br />Commerits,(Clearly describe any deficiencies found) , <br />W0: 2338020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.