My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
5749
>
2800 - Aboveground Petroleum Storage Program
>
PR0515802
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2019 10:26:15 AM
Creation date
10/2/2018 10:02:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0515802
PE
2832
FACILITY_ID
FA0021241
FACILITY_NAME
TRACY MUNICIPAL AIRPORT
STREET_NUMBER
5749
Direction
S
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
5749 S TRACY BLVD
P_DISTRICT
005
QC Status
Approved
Scanner
EJimenez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. In -Tank Gauging / SIR Equipment: P Check this box if tank gauging is used only for inventory control. <br />r Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Complete the following checklist: <br />Yes <br />No* <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />Yes <br />No* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />Yes <br />No* <br />Was accuracy of system product level readings tested? <br />Yes <br />No* <br />Was accuracy of system water level readings tested? <br />Yes <br />No* <br />lWere all probes reinstalled properly? <br />Yes <br />No* <br />ere all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD): P Check this box if LLDs are not installed. <br />Complete the following checklist: <br />Yes <br />No* <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? (Check all that <br />apply) Simulated leak rate: r 3 g.p.h.; r 0.1 g.p.h; r 0.2 g.p.h. <br />N/A <br />Yes <br />C No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />Yes <br />No* <br />Was the testing apparatus properly calibrated? <br />Yes <br />No* <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />N/A <br />Yes <br />No* <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />N/A <br />• Yes <br />No* <br />For electronic LLDs that are programmed for positive shut down, does the turbine automatically shut off if any portion of the <br />monitoring system is disabled or disconnected? <br />N/A <br />• Yes <br />r No* <br />For electronic LLDs that are programmed for positive shut down, does the turbine automatically shut off if any portion of the <br />monitoring system malfunctions or fails a test? <br />N/A <br />Yes <br />No* <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />N/A <br />Yes <br />r` No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />N P' ..tc- <br />Page 3 of 3 12/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.