My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
15453
>
2800 - Aboveground Petroleum Storage Program
>
PR0523476
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 3:19:48 PM
Creation date
10/2/2018 11:28:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0523476
PE
2832
FACILITY_ID
FA0015491
FACILITY_NAME
PROFLEET TRUCK LUBE
STREET_NUMBER
15453
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
LODI
Zip
95242
APN
02519006
CURRENT_STATUS
01
SITE_LOCATION
15453 N THORNTON RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
EJimenez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQUIN COUNTY <br /> ENVIRONMENTAL HEALTH DEPARTMENT <br /> 600 East Main Street, Stockton, California 95202-3029 <br /> Telephone:(209)468-3420 Fax:(209)468-3433 Web:www.s*gov.org/ehd/unitiii.html <br /> CONTINUATION FORM Page: 4 of 4 <br /> OFFICIAL INSPECTION REPORT Date: 06/22/11 <br /> Facility Address: Profleet Inc. 15453 N. Thornton Rd. Lodi, CA 95242 Program: APSA <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS 11,or MINOR-Notice to Comply) <br /> 19 & 27. The inventory listed in the SPCC Plan does not include the sizes, specific contents, nor a <br /> prediction of the direction, rate of flow, nor total quantity of oil which could be discharged as a result of <br /> each type of major equipment failure for the tanks and drums. The SPCC Plan must include the correct <br /> type of oil and storage capacity of each fixed storage container, and either the type of oil and storage <br /> capacity of each portable container or an estimate of the potential number of portable containers, types <br /> of oil, and anticipated storage capacities. The Plan must include discharge or drainage controls, such as <br /> secondary containment around all containers and other structures, equipment, and procedures for the <br /> control of a discharge, and a prediction of the direction. rate of flow, and total quantity of oil which could <br /> be discharged as a result of each type of major equipment failure. Immediately update the inventory and <br /> discharge information in the SPCC Plan to accurately represent the petroleum storage at the facility. <br /> ALL EHD STAFF TIME ASSOCIATED WITH FAILING TO COMPLY BY THE ABOVE NOTED DATES WILL BE BILLED AT THE CURRENT HOURLY RATE($122). <br /> THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br /> EHD Inspect o �/!� Received By: Title: <br /> EHD 23-02-003 Rev 08/10/10 CONTINUATION FORM <br />
The URL can be used to link to this page
Your browser does not support the video tag.