My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
2131
>
2800 - Aboveground Petroleum Storage Program
>
PR0535925
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2019 11:37:12 AM
Creation date
10/2/2018 11:43:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0535925
PE
2833
FACILITY_ID
FA0009893
FACILITY_NAME
NORTHERN CALIF POWER - LODI
STREET_NUMBER
2131
Direction
W
STREET_NAME
TURNER
STREET_TYPE
RD
City
LODI
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
2131 W TURNER RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
EJimenez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECL..-IVED /CALIFORNIA <br /> NCPA <br /> FEB0 5 2016NORTHERN POWER AGENCY <br /> ENVIRONMENTAL <br /> HEALTH DEPARTMENT <br /> February 4, 2016 PO Box 147 a <br /> 12745 N. Thornton Road <br /> Mr. Arris Veloso, RENS, MBA Lodi, CA 95241 <br /> Senior Registered Environmental Health Specialist (2 0 9) 3 33-6370 <br /> San Joaquin County Environmental Health Department www.ncpa.com <br /> 1868 E. Hazelton Ave. <br /> Stockton, CA 95205 <br /> RE: Return to Compliance Certification, Aboveground Petroleum Storage Act <br /> Dear Mr. Veloso, <br /> The following table details the corrective actions taken or will be taken for violations observed <br /> during your Aboveground Petroleum Storage Act Inspection on January 6, 2016: <br /> Violation # Corrective Action <br /> 601 The SPCC plan has been rewritten and amended to follow the <br /> order of sequence of CFR Part 112 and any other applicable <br /> section of this part. Attached is a copy of the plan for your <br /> reference. <br /> 604, 605 The SPCC plan has been rewritten and amended to address <br /> facility layout, operations discharge prevention methods and <br /> containers. Attached is a copy of the plan for your reference. <br /> 609, 704, 706 The secondary containment of the 138,600 gallon diesel storage <br /> tank has not been compromised even though the outer motor is <br /> cracked. The secondary containment is an earthen dike, which is <br /> protected from erosion by a mortar exterior. Please see page 37 <br /> of the SPCC plan for more information. Performance <br /> Mechanical Inc. has been contacted to repair the cracks. <br /> 613,713 Attached are the most recent inspections conducted by John <br /> Strandberg, P.E. We have contracted with Performance <br /> Mechanical Inc. to complete the deficiencies noted in the P.E.'s <br /> reports. <br /> 710 We have revised the site's weekly inspection log to record <br /> drainage of uncontaminated rainwater from diked areas and <br /> secondary containments. Please see Task#476 of the weekly <br /> ins ection <br /> log sheet. <br /> 716 A drum level gauge has been installed on all 55 gallon drums <br /> used oil and in-use liquid oil drums. Please see the attached <br /> photo as evidence of gauge installation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.