Laserfiche WebLink
RECEJVED Page I of 4 <br /> FEB 0 5 2016 Work Order <br /> Combustion Turbinesz <br /> ENVIRONMENTAL Printed 2/4/2016-12:41 PM <br /> . NCPA <br /> MGRTHER'i CALEfuRNIA POWER AGENCY <br /> Maintenance Details <br /> Requested: Target: Combustion Turbine Facilities <br /> Procedure: CHECKLIST, WEEKLY(UY-0001 Priority(Type: C T 1 Lodi <br /> CT1) <br /> Shop: LODI Contact:Phone: <br /> Reason: CHECKLIST, WEEKLY <br /> F Warranty F Shutdown F Lockout F Attach F Charge <br /> Tasks <br /> # Description Rating Nleas. Initials Failed Complete <br /> 100 Safety <br /> ENSURE FACILITY IS MAINTAINED TO MINIMIZE THE POSSIBILITY OF A <br /> FIRE, EXPLOSION, OR RELEASE OF A HAZARDOUS WASTE TO AIR, <br /> SOIL, OR SURFACE WATER WHICH COULD THREATEN HUMAN LIFE OR <br /> THE ENVIRONMENT. IMMEDIATELY CLEAN UP OILY RESIDUALS OR <br /> HAZARDOUS WASTES FOUND OUTSIDE OF CONTAINERS OR <br /> EQUIPMENT, INCLUDING. BUT NOT LIMITED TO SECONDARY <br /> 101 CONTAINMENTS. F F <br /> APPLICABLE ONLY IF THERE ARE ANY COMPRESSED GAS CYLINDERS <br /> ON-SITE: INSPECT ON-SITE COMPRESSED GAS CYCLINDERS FOR <br /> EXTERIOR CORROSION, DENTING, BULGING, GOUGES OR DINGS. <br /> GOUGES AND DINGS SHOULD BE CLOSELY INSPECTED FOR SEVERITY <br /> AND DAMAGED CYLINDERS RETURNED TO THE SUPPLIER IF <br /> 103 DETERMINED UNSAFE. F F <br /> APPLICABLE ONLY IF THERE ARE ANY COMPRESSED GAS CYLINDERS <br /> ON-SITE: INSPECT ON-SITE COMPRESSED GAS CYLINDERS <br /> REGULATORS, VALVES AND ASSOCIATED TUBING CONNECTIONS FOR <br /> 104 LEAKS USING A SOAPY SOLUTION. F F <br /> ENSURE ALL MACHINERY IS PROPERLY GUARDED. FOR EXAMPLE <br /> FENCING, ENCLOSURES OR FIXED BARRIERS ARE MOUNTED ON, <br /> AROUND, A MACHINE TO PREVENT ACCESS TO MOVING PARTS OR <br /> ANY AREA OF A MACHINE OR PIECE OF EQUIPMENT THAT CREATES A <br /> POTENTIAL HAZARD TO PERSONNEL SUCH AS POINT OF OPERATION, <br /> 105 NIP-POINTS, ROTATING PARTS. F F <br /> 200 Work Order Steps/Tasks <br /> 201 PERFORM JOB TASKS FOR SITE F <br /> 300 Job Task/Form <br /> Turbine Generator <br /> 303 L.O. RESERVOIR LEVEL F F <br /> 304 DIESEL DAY TANK LEVEL F F <br /> HALON BOTTLE PRESSURE PRIMARY PSI <br /> 305 RESERVE PSI F F <br /> 306 DIESEL ENGINE L.O. LOW/FULL I ! F <br /> DIESEL ENGINE FUEL TOTALIZER SUPPLY DIESEL ENGINE <br /> 307 FUEL TOTALIZER RETURN F F <br /> 303 DIESEL HOUR METER F r- <br /> 309 <br /> 309 L.O. RESERVOIR TEMPERATURE °F F F <br /> 310 FIRED TIME F F <br />